Geo Piling Solutions
Greensboro, NC 27410
Featured Project Return to Projects List
River Hill High School
Project Information
- Project Location:
- Clarksville, MD
- Approx Contract:
- $40,000
- Status:
- Completed
- Structure Type:
- School / College / University
References
- Owner:
- Howard County Schools
- Architect:
- Whitney Bailey Cox & Magnani
- General Contractor:
- Bob Porter Construction
- Client:
-
Steve
Porter
-
Sr. Project Manager
(410) 552-6210Bob Porter Construction
Scope Of Work
The school’s cafeteria and gym hallway's existing foundations had settled and produced excessive cracking, so F&SS installed a 50-pile solution. At the gym hallway, we provided Helical Piles as a Value Engineering substitute for compaction grouting.
- Provided both cost and time savings while simplifying the installation process.
- Accessed equipment through 6-foot wide by 7-foot tall doorways to install the 10-ton design load piles.
- All piles were installed on time within 3 days (including moving in & out of the building twice to accommodate piles added during the installation process).