Rickerman & Co.

Share

Santa Monica, CA 90401

Company Info

  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Our main lines of business include: Access Control Systems, Acoustical Contractors, Alarm Systems, Mason Contractors, Building Alterations, Carpentry Contractors.

Rickerman & Co. has been listed in the Blue Book since 2017.

What We Do

Regions & Counties Serviced

  • California-Los Angeles and Vicinity

California 1

  • Los Angeles

Our CSI Codes

01 21 43 - Time Allowances
01 24 13 - Value Engineering
01 29 83 - Payment Procedures for Testing Laboratory Services
01 31 13 - Project Coordination
01 31 19.13 - Preconstruction Meetings
01 35 16 - Alteration Project Procedures
01 55 16 - Haul Routes
01 74 16 - Site Maintenance
01 74 19 - Construction Waste Management and Disposal
01 84 19 - Interior Finishes Performance Requirements
01 85 00.00.01 - Conveying Equipment Performance Requirements
01 87 13 - Equipment Performance Requirements
01 88 16 - Selective Construction Performance Requirements
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 91 23 - Interiors Commissioning
01 91 23.13 - Interior Construction Commissioning
01 91 23.43 - Stairways Commissioning
01 93 16 - Recycling Programs
02 32 19 - Exploratory Excavations
02 58 16 - Snow Avalanche Control
03 01 20 - Maintenance of Concrete Reinforcing
03 01 30 - Maintenance of Cast-in-Place Concrete
03 01 70 - Maintenance of Mass Concrete
03 05 00.00.01 - Common Work Results for Concrete
03 06 20 - Schedules for Concrete Reinforcing
03 06 20.13 - Concrete Beam Reinforcing Schedule
03 06 20.16 - Concrete Slab Reinforcing Schedule
03 06 30 - Schedules for Cast-in-Place Concrete
03 06 30.13 - Concrete Footing Schedule
03 06 30.16 - Concrete Column Schedule
03 06 30.19 - Concrete Slab Schedule
03 06 30.26 - Concrete Beam Schedule
03 06 70 - Schedules for Mass Concrete
03 08 00.00.01 - Commissioning of Concrete
03 30 53 - Miscellaneous Cast-in-Place Concrete
03 31 13 - Heavyweight Structural Concrete
03 31 23 - High-Performance Structural Concrete
03 70 00.00.01 - Mass Concrete
03 71 00.00.01 - Mass Concrete for Raft Foundations
03 72 00.00.01 - Mass Concrete for Dams
04 01 20 - Maintenance of Unit Masonry
04 01 20.51 - Unit Masonry Maintenance
04 01 60 - Maintenance of Corrosion-Resistant Masonry
04 01 70 - Maintenance of Manufactured Masonry
04 05 16 - Masonry Grouting
04 06 20 - Schedules for Unit Masonry
04 06 20.13 - Masonry Unit Schedule
04 06 60 - Schedules for Corrosion-Resistant Masonry
04 08 00.00.01 - Commissioning of Masonry
04 57 00.00.01 - Masonry Fireplaces
06 01 10 - Maintenance of Rough Carpentry
06 01 10.71 - Rough Carpentry Rehabilitation
06 01 10.91 - Rough Carpentry Restoration
06 01 10.92 - Rough Carpentry Preservation
06 06 10 - Schedules for Rough Carpentry
06 06 10.13 - Nailing Schedule
06 06 10.19 - Plywood Shear Wall Schedule
06 10 53 - Miscellaneous Rough Carpentry
06 13 13 - Log Construction
06 13 13.91 - Period Horizontal Log Work
06 13 16 - Pole Construction
06 13 23 - Heavy Timber Construction
06 14 00.00.01 - Treated Wood Foundations
06 20 13 - Exterior Finish Carpentry
06 46 91 - Splicing of Wooden Components
06 48 23 - Stick-Built Wood Windows
08 01 10 - Operation and Maintenance of Doors and Frames
08 01 52 - Operation and Maintenance of Wood Windows
08 01 52.61 - Wood Window Repairs
08 01 52.71 - Wood Window Rehabilitation
08 01 52.81 - Wood Window Replacement
08 01 52.91 - Wood Window Restoration
08 01 74 - Operation and Maintenance of Access Control Hardware
08 06 10 - Door Schedule
08 52 13 - Metal-Clad Wood Windows
08 52 16 - Plastic-Clad Wood Windows
08 74 19 - Biometric Identity Access Control Hardware
09 01 30 - Maintenance of Tiling
09 01 80 - Maintenance of Acoustic Treatment
09 06 30 - Schedules for Tiling
09 06 50 - Schedules for Ceilings
09 06 80 - Schedules for Acoustical Treatment
09 30 13 - Ceramic Tiling
09 51 53 - Direct-Applied Acoustical Ceilings
09 64 16 - Wood Block Flooring
11 14 13.13 - Portable Posts and Railings
11 14 13.16 - Rotary Gates
11 14 13.19 - Turnstiles
11 82 13 - Solid Waste Bins
12 11 23 - Brick Murals
12 11 26 - Ceramic Tile Murals
21 01 10 - Operation and Maintenance of Water-Based Fire-Suppression Systems
21 01 30 - Operation and Maintenance of Fire-Suppression Equipment
21 05 16 - Expansion Fittings and Loops for Fire-Suppression Piping
21 06 10 - Schedules for Water-Based Fire-Suppression Systems
21 10 00.00.01 - Water-Based Fire-Suppression Systems
21 13 13 - Wet-Pipe Sprinkler Systems
21 13 16 - Dry-Pipe Sprinkler Systems
21 13 19 - Preaction Sprinkler Systems
21 13 23 - Combined Dry-Pipe and Preaction Sprinkler Systems
21 13 26 - Deluge Fire-Suppression Sprinkler Systems
21 13 29 - Water Spray Fixed Systems
21 13 36 - Antifreeze Sprinkler Systems
21 13 39 - Foam-Water Systems
21 21 13 - Carbon-Dioxide Fire-Extinguishing Piping
21 22 13 - Clean-Agent Fire-Extinguishing Piping
21 22 16 - Clean-Agent Fire-Extinguishing Equipment
21 23 13 - Wet-Chemical Fire-Extinguishing Piping
21 23 16 - Wet-Chemical Fire-Extinguishing Equipment
21 24 13 - Dry-Chemical Fire-Extinguishing Piping
22 13 13 - Facility Sanitary Sewers
22 13 16 - Sanitary Waste and Vent Piping
22 13 19 - Sanitary Waste Piping Specialties
22 14 13 - Facility Storm Drainage Piping
23 22 13.13 - Underground Steam and Condensate Heating Piping
25 05 26 - Grounding and Bonding for Integrated Automation
25 58 00.00.01 - Integrated Automation Control of Electronic Safety and Security Systems
25 98 00.00.01 - Integrated Automation Control Sequences for Electronic Safety and Security Systems
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 05 43 - Underground Ducts and Raceways for Electrical Systems
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 13 - Medium-Voltage Cutouts
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 05 26 - Grounding and Bonding for Communications Systems
27 11 13 - Communications Entrance Protection
28 01 10 - Operation and Maintenance of Electronic Access Control and Intrusion Detection
28 01 10.51 - Maintenance and Administration of Electronic Access Control and Intrusion Detection
28 01 10.71 - Revisions and Upgrades of Electronic Access Control and Intrusion Detection
28 01 30 - Operation and Maintenance of Electronic Detection and Alarm
28 01 30.51 - Maintenance and Administration of Electronic Detection and Alarm
28 01 30.71 - Revisions and Upgrades of Electronic Detection and Alarm
28 05 26 - Grounding and Bonding for Electronic Safety and Security
28 05 28 - Pathways for Electronic Safety and Security
28 06 10 - Schedules for Electronic Access Control and Intrusion Detection
28 06 30 - Schedules for Electronic Detection and Alarm
28 10 00.00.01 - Electronic Access Control and Intrusion Detection
28 13 13 - Access Control Global Applications
28 13 16 - Access Control Systems and Database Management
28 13 19 - Access Control Systems Infrastructure
28 13 26 - Access Control Remote Devices
28 13 33 - Access Control Interfaces
28 13 33.16 - Access Control Interfaces to Access Control Hardware
28 13 33.26 - Access Control Interfaces to Intrusion Detection
28 13 33.36 - Access Control Interfaces to Fire Alarm
28 13 43 - Access Control Identification Management Systems
28 13 53 - Security Access Detection
28 13 53.29 - Security Access Sniffing Equipment
28 16 13 - Intrusion Detection Control, GUI, and Logic Systems
28 16 16 - Intrusion Detection Systems Infrastructure
28 16 19 - Intrusion Detection Remote Devices and Sensors
28 16 33 - Intrusion Detection Interfaces
28 16 33.13 - Intrusion Detection Interfaces to Remote Monitoring
28 16 33.16 - Intrusion Detection Interfaces to Access Control Hardware
28 16 33.23 - Intrusion Detection Interfaces to Access Control System
28 16 33.36 - Intrusion Detection Interfaces to Fire Alarm
28 16 46 - Intrusion Detection Vehicle Control Systems
28 26 13 - Electronic Personal Safety Detection Systems
28 26 16 - Electronic Personal Safety Alarm Annunciation and Control Systems
28 30 00.00.01 - Electronic Detection and Alarm
28 31 13 - Fire Detection and Alarm Control, GUI, and Logic Systems
28 31 23 - Fire Detection and Alarm Annunciation Panels and Fire Stations
28 31 33 - Fire Detection and Alarm Interfaces
28 31 33.13 - Fire Detection and Alarm Interfaces to Remote Monitoring
28 31 33.16 - Fire Detection and Alarm Interfaces to Access Control Hardware
28 31 33.23 - Fire Detection and Alarm Interfaces to Access Control System
28 31 33.43 - Fire Detection and Alarm Interfaces to Elevator Control
28 31 53 - Fire Alarm Initiating Devices
28 31 53.23 - Fire Alarm Level Detectors Switches
28 31 53.33 - Fire Alarm Flow Switches
28 31 53.43 - Fire Alarm Pressure Sensors
28 31 63 - Fire Alarm Integrated Audio Visual Evacuation Systems
28 31 63.13 - Fire Alarm Horns and Strobes
28 32 13 - Radiation Detection and Alarm Control, GUI, and Logic Systems
28 32 23 - Radiation Detection and Alarm Integrated Audio Evacuation Systems
28 32 33 - Radiation and Alarm Detection Sensors
28 32 43 - Radiation and Alarm Dosimeters
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 13 13 - Selective Tree and Shrub Removal
31 13 16 - Selective Tree and Shrub Trimming
31 14 13.23 - Topsoil Stripping and Stockpiling
31 21 16.13 - Methane Venting
31 23 13 - Subgrade Preparation
31 30 00.00.01 - Earthwork Methods
32 01 17.62 - Stress-Absorbing Membrane Interlayer
32 01 23 - Base Course Reconditioning
32 01 26 - Rigid Paving Rehabilitation
32 01 26.74 - Concrete Overlays
32 01 29 - Rigid Paving Repair
32 01 29.62 - Concrete Paving Raising
32 01 30 - Operation and Maintenance of Site Improvements
32 01 90 - Operation and Maintenance of Planting
32 01 90.13 - Fertilizing
32 01 90.16 - Amending Soils
32 01 90.19 - Mowing
32 01 90.23 - Pruning
32 01 90.26 - Watering
32 01 90.29 - Topsoil Preservation
32 01 90.33 - Tree and Shrub Preservation
32 05 33 - Common Work Results for Planting
32 06 10 - Schedules for Bases, Ballasts, and Paving
32 06 10.13 - Pedestrian Walkway Schedule
32 06 30 - Schedules for Site Improvements
32 06 90 - Schedules for Planting
32 06 90.13 - Planting Schedule
32 11 13 - Subgrade Modifications
32 11 13.13 - Lime-Treated Subgrades
32 11 13.16 - Bituminous-Treated Subgrades
32 12 13.23 - Asphaltic Prime Coats
32 12 16.13 - Plant-Mix Asphalt Paving
32 12 16.16 - Road-Mix Asphalt Paving
32 12 16.19 - Cold-Mix Asphalt Paving
32 12 16.23 - Reinforced Asphalt Paving
32 12 16.26 - Fiber-Modified Asphalt Paving
32 12 16.29 - Polymer-Modified Asphalt Paving
32 12 16.33 - Granulated Rubber-Modified Asphalt Paving
32 13 13 - Concrete Paving
32 13 13.13 - Exposed Aggregate Concrete Paving
32 13 13.16 - Power-Compacted Concrete Paving
32 13 13.19 - Prestressed Concrete Paving
32 13 16.13 - Patterned Concrete Paving
32 13 16.16 - Roller-Compacted Concrete Paving
32 13 16.19 - Imprinted Concrete Paving
32 13 16.23 - Stamped Concrete Paving
32 18 23.13 - Baseball Field Surfacing
32 18 23.16 - Natural Baseball Field Surfacing
32 18 23.26 - Natural Field Sport Surfacing
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
32 90 00.00.01 - Planting
32 91 13 - Soil Preparation
32 91 13.19 - Planting Soil Mixing
32 91 13.26 - Planting Beds
32 92 16 - Plugging
32 96 13 - Ground Cover Transplanting
32 96 23 - Plant and Bulb Transplanting
32 96 33 - Shrub Transplanting
32 96 43 - Tree Transplanting
33 01 30 - Operation and Maintenance of Sewer Utilities
33 01 30.51 - Maintenance of Sewer Utilities
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 05 13.13 - Manhole Grade Adjustment
33 06 10 - Schedules for Water Utilities
33 06 30 - Schedules for Sanitary Sewerage Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 30 - Instrumentation and Control for Sanitary Sewerage Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 30 00.00.01 - Sanitary Sewerage Utilities
33 31 13 - Public Sanitary Utility Sewerage Piping
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 39.23 - Underground High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
33 81 23 - Aerial Cable Installation Hardware
34 01 33 - Operation and Maintenance of Airfields
34 05 33 - Common Work Results for Airports
34 06 33 - Schedules for Airfields
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
34 54 33 - Passenger Fare Gates
35 01 70 - Operation and Maintenance of Dams
35 05 70 - Common Work Results for Dams
35 06 70 - Schedules for Dams
35 49 13 - Floodwalls
35 49 13.13 - Concrete Floodwalls
35 49 13.16 - Masonry Floodwalls
35 70 00.00.01 - Dam Construction and Equipment
35 71 13 - Concrete Gravity Dams
35 71 16 - Masonry Gravity Dams
35 72 13 - Concrete Arch Dams
35 73 13 - Earth Embankment Dam
35 74 13 - Concrete Buttress Dams
40 23 36 - Sanitary Water Process Piping
40 95 73 - Process Control Wiring
44 01 50 - Operation and Maintenance of Solid Waste Control
44 06 50 - Schedules for Solid Waste Control
44 51 26 - Solid Waste Containers
44 51 29 - Solid Waste Transfer Trailers
Service Area and Locations Map for Rickerman & Co.
Share URL copied!
https://www.thebluebook.com/iProView/1533763/rickerman-co/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.