Henry Ford Health System

Project Information

Project Location:
MI
Status:
Completed
Structure Type:
Hospital / Nursing Home

Scope Of Work

Purpose of this project was to tie the Data Center building with the Annex building across the parking lot. Two 48-strand multi-mode OM4 fiber cables and two 50-pair CAT3 copper cables were run between the two buildings, in diverse paths, through underground duct.

All cabling was grounded with shield bond connectors, and the copper was terminated to lightning protection blocks at both ends, then transitioned to plenum cabling to complete the run to the final termination point. Conduits were water blocked at both ends.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/1532468/conti-corporation/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.