Bellin College-New Campus Building

Project Information

Project Location:
Bellevue, WI
Status:
Completed
Structure Type:
School / College / University

References

Architect:
McMahon Group

Scope Of Work

The new campus is located on a 17.5 acre site which offers room for future expansion as the college grows and expands its curriculum. The first classes in the fall of 2009 marked the 100th anniversary of the college.

At its original location the capacity of the college was 300 students. The new campus doubles the enrollment size. It is the college’s desire to offer their students other career choices besides nursing, such as a radiology program, thus addressing their mission of providing well-educated healthcare professionals.

This two-story building that is 73,000 sq. ft. consists of:

11,000 sq. ft. of future build out space

Full basement

Two health assessment labs with seven stations each, set up to mimic clinical exam rooms

Two skills labs with six stations each, set up to mimic hospital rooms

Two functioning radiology rooms with a shared control room

One simulations lab

One practice lab

Four classrooms with seating for 60 students each

A tiered classroom with seating for 96 students

Large atrium open to the second floor with study balconies on the second floor overlooking the first floor

Open decorative stairs from second floor to lower level

Two-story curtain wall in the atrium

Vending and food prep area for students and faculty

A computer resource center

Large library on the second floor

Wellness center/exercise room for students and faculty

Executive office area with boardroom

Integrated Lean Project Delivery®(ILPD)
This project utilized Boldt’s integrated project delivery method along with target costing to help Bellin College meet their desired budget. Target costing is a process in which Boldt generates a budget based on the owner’s project requirements and links those requirements to cost data from similar projects. We can then determine if the owner’s requirements fit within the desired budget.

The ILPD team is made up of the owner, architect, Boldt project manager, mechanical, electrical, plumbing and fire protection sub-contractors. They met on a weekly basis and reviewed the design progress, budget and schedule. If an issue arose with the above decisions, corrections could be made to address the issue. The greatest benefit of this process was that any drawing conflicts, schedule surprises and budget overruns were greatly reduced due to the upfront collaboration prior to and during construction.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1523160/the-boldt-company/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.