People Also View These
Loading...
Commercial Experience
Misc Project
Mixed Use
Apartments & Condominiums
Assisted Living
Bank
Church / Synagogue
Gas Station
Grocery Stores
Hotel / Motel
Medical Office
Non-Building Construction
Non-Residential Building
Office Building
Residential Building
Restaurant
Retail Store
Storage Facility / Warehouse
Regions & Counties Serviced
- Houston
Texas 7
- Brazoria
- Fort Bend
- Harris
- Victoria
- Waller
- Washington
- Wharton
Our CSI Codes
01 35 16 - Alteration Project Procedures
03 01 20 - Maintenance of Concrete Reinforcing
03 01 30 - Maintenance of Cast-in-Place Concrete
03 06 20 - Schedules for Concrete Reinforcing
03 06 20.13 - Concrete Beam Reinforcing Schedule
03 06 20.16 - Concrete Slab Reinforcing Schedule
03 06 30 - Schedules for Cast-in-Place Concrete
03 06 30.13 - Concrete Footing Schedule
03 06 30.16 - Concrete Column Schedule
03 06 30.19 - Concrete Slab Schedule
03 06 30.26 - Concrete Beam Schedule
03 30 53 - Miscellaneous Cast-in-Place Concrete
03 31 13 - Heavyweight Structural Concrete
03 31 23 - High-Performance Structural Concrete
07 01 30 - Maintenance of Steep Slope Roofing
07 01 50 - Maintenance of Membrane Roofing
07 01 50.23 - Roof Removal
07 01 50.61 - Roof Re-Coating
07 01 50.81 - Roof Replacement
07 01 50.91 - Roofing Restoration
07 06 30 - Schedules for Steep Slope Roofing
07 06 50 - Schedules for Membrane Roofing
07 57 13 - Sprayed Polyurethane Foam Roofing
25 05 26 - Grounding and Bonding for Integrated Automation
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 13 - Medium-Voltage Cutouts
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 05 26 - Grounding and Bonding for Communications Systems
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 81 23 - Aerial Cable Installation Hardware
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
35 01 70 - Operation and Maintenance of Dams
35 05 70 - Common Work Results for Dams
35 06 70 - Schedules for Dams
35 49 13 - Floodwalls
35 49 13.13 - Concrete Floodwalls
35 70 00.00.01 - Dam Construction and Equipment
35 71 13 - Concrete Gravity Dams
35 71 16 - Masonry Gravity Dams
35 72 13 - Concrete Arch Dams
35 74 13 - Concrete Buttress Dams
40 95 73 - Process Control Wiring