Featured Project

Banana Ave improvement project

Project Location:
Fontana, CA
Completion:
Jun 2018

Scope Of Work

Completed two CML&C ten inch double detector checks from tie-in to main to final riser, three fire hydrant runs from main tie-in to riser; two copper water services; four water service cut and plugs att he main line; and removal of one existing hydrant and valve assembly to include saw cutting, excavating and paving.

 

Project Images

#
#
#
#