Alkami Technologies
Project Information
- Project Location:
- Frisco, TX
- Approx Contract:
- $20,000
- Status:
- Completed - Feb 2017
- Structure Type:
- Office Building
References
- Owner:
- Alkami
- General Contractor:
- Direct Client
Scope Of Work
Type of Project: First floor expansion: Installed 2-single cable stations (for WIFI locations), installed 21-dual cable stations, & 8-quad cable stations -76 Cat5e plenum cables total. Installed Hilti wire with j-hooks for cabling support. Installed 6-strand multi-mode fiber optic cabling from first floor IDF to 2nd floor MDF utilizing existing conduit. Installed 2x2 enclosed wall mount cabinet and 4x4 plywood. Terminated, labeled, dressed, & tested all copper and fiber optic cabling.