J. Smucker Contracting
Gap, PA 17527
Featured Project Return to Projects List
W.L. Scott
Project Information
- Project Location:
- Exton, PA
- Status:
- Completed
- Structure Type:
- Office Building
Scope Of Work
Roof Size – 14,000 square feet
Roof System Installed – Fabric Reinforced Roofing System
Warranty – 18 years
Roof Details
Existing roof – EPDM Rubber Roof
Unique Challenges
Active facility, complete tear-off would have forced them to shut down production
Multi-Tenant building, main tenant is a live Christian Radio Broadcast studio, tear off
would have forced them to shut down
Multiple leaks
Rubber was at the end of it’s life
Solution
We pressure washed the entire roof, applied Conkin Tackcoat primer
Applied Conklin Benchmark basecoat and fabric over the entire roof
Applied Puma XL topcoat over the entire roof
Benefits
Building is leak-free
Operations not paused at all
Spray foam added R value – 8
Puma XL white top coat decreases the roof temps in summer, lower cooling costs
The building has a totally seamless liquid applied roofing system that will last for
years
18-year non-pro-rated warranty