Oil Tank Farm Powersystem Foundations

Project Information

Project Location:
Galveston, TX
Status:
Completed
Structure Type:
Power Generation & Distribution

Scope Of Work

Project

Galveston TX Oil Tank Farm Powersystem Foundations
 

Installation Criteria:
4.5″ pressure grouted HD Micropile 25ft & 5.5″ Pressure grouted HD Micropile 55ft
 
Project Lead:
Tim Johnston
 
Equipment:Cat 349 with a HD150 & Komatsu 490 with a HD70
 
Installation Depths:
25ft and 55
 
Jobsite Restrictions:Superfund site. Piles cannot create a pathway between contamination and clean water aquifirs. Tower loading – tension and compression
 
Geotechnical Concerns:
High ground water, clay rich soils
 
APE supplied:
Tools, materials and engineering and testing support
 
Time to Install single unit:
8-15 min
25ft 4.5″ Pressure Grouted pile 25 min 55ft 5.5″ pressure grouted pile
 
APE job influence:APE added its new thread on cap for this project and directed load testing and design.
  
 
Description:The EPA controlled the process of pile selection, the process for pile approval was stalling the job. The APE Pressure Grouted HD Micropile gave the EPA the pile they needed to protect the clean water aquifirs from the contaminated soils above. Approval of the HD pile moved the project forward. APE provided engineering and load testing support to complete the design of towers and cable tray racks. APE used its new thread on pile cap to eliminate onsite welding from the pile process.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1456223/pileworks/manufacturers/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.