Sorcar Engineering, Inc.

Arvada, CO 80004

Company Info

  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Our main lines of business include: Alarm Systems, Communication Systems, Engineers--Consulting.

Sorcar Engineering, Inc. has been listed in the Blue Book since 2016.

What We Do

  • Alarm Systems
  • Communication Systems
  • Engineers--Consulting

Regions & Counties Serviced

  • Colorado and Wyoming

Colorado 1

  • Jefferson

Our CSI Codes

01 45 26 - Plant Inspection Procedures
01 51 33 - Temporary Telecommunications
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 80 00.00.01 - Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 06 30 - Schedules for Subsurface Investigations
02 08 00.00.01 - Commissioning of Existing Conditions
02 22 19 - Traffic Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 29 - Magnetotelluric Investigations
02 32 23 - Geotechnical Monitoring Before Construction
05 08 00.00.01 - Commissioning of Metals
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
10 08 00.00.01 - Commissioning of Specialties
11 08 00.00.01 - Commissioning of Equipment
11 28 19 - Self-Contained Facsimile Machines
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
21 08 00.00.01 - Commissioning of Fire Suppression
22 08 00.00.01 - Commissioning of Plumbing
23 08 00.00.01 - Commissioning of HVAC
25 08 00.00.01 - Commissioning of Integrated Automation
25 37 00.00.01 - Integrated Automation Instrumentation and Terminal Devices for Communications Systems
25 57 00.00.01 - Integrated Automation Control of Communications Systems
25 97 00.00.01 - Integrated Automation Control Sequences for Communications Systems
26 05 73 - Overcurrent Protective Device Coordination Study
26 08 00.00.01 - Commissioning of Electrical Systems
27 01 50 - Operation and Maintenance of Distributed Communications and Monitoring
27 05 13 - Communications Services
27 05 48 - Vibration and Seismic Controls for Communications Systems
27 05 53 - Identification for Communications Systems
27 06 50 - Schedules for Distributed Communications and Monitoring
27 08 00.00.01 - Commissioning of Communications
27 15 00.43 - Nurse Call and Intercom Communications Horizontal Cabling
27 15 00.46 - Paging Communications Horizontal Cabling
27 22 29 - Data Communications Handhelds
27 33 26 - Facsimile Servers
27 42 19 - Public Information Systems
27 50 00.00.01 - Distributed Communications and Monitoring Systems
27 51 13 - Paging Systems
27 51 13.13 - Overhead Paging Systems
27 51 16 - Public Address and Mass Notification Systems
27 52 16 - Telemedicine Systems
27 52 19 - Healthcare Imaging Systems
27 52 23 - Nurse Call/Code Blue Systems
27 53 13 - Clock Systems
28 01 30 - Operation and Maintenance of Electronic Detection and Alarm
28 01 30.51 - Maintenance and Administration of Electronic Detection and Alarm
28 01 30.71 - Revisions and Upgrades of Electronic Detection and Alarm
28 06 30 - Schedules for Electronic Detection and Alarm
28 08 00.00.01 - Commissioning of Electronic Safety and Security
28 16 33 - Intrusion Detection Interfaces
28 16 33.36 - Intrusion Detection Interfaces to Fire Alarm
28 16 46 - Intrusion Detection Vehicle Control Systems
28 26 16 - Electronic Personal Safety Alarm Annunciation and Control Systems
28 30 00.00.01 - Electronic Detection and Alarm
28 31 13 - Fire Detection and Alarm Control, GUI, and Logic Systems
28 31 23 - Fire Detection and Alarm Annunciation Panels and Fire Stations
28 31 33 - Fire Detection and Alarm Interfaces
28 31 33.13 - Fire Detection and Alarm Interfaces to Remote Monitoring
28 31 33.43 - Fire Detection and Alarm Interfaces to Elevator Control
28 31 53 - Fire Alarm Initiating Devices
28 31 53.23 - Fire Alarm Level Detectors Switches
28 31 53.33 - Fire Alarm Flow Switches
28 31 53.43 - Fire Alarm Pressure Sensors
28 31 63 - Fire Alarm Integrated Audio Visual Evacuation Systems
28 31 63.13 - Fire Alarm Horns and Strobes
28 32 13 - Radiation Detection and Alarm Control, GUI, and Logic Systems
28 32 23 - Radiation Detection and Alarm Integrated Audio Evacuation Systems
28 32 33 - Radiation and Alarm Detection Sensors
28 32 43 - Radiation and Alarm Dosimeters
31 08 00.00.01 - Commissioning of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
32 08 00.00.01 - Commissioning of Exterior Improvements
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 80 00.00.01 - Commissioning of Process Systems
40 95 63 - Process Control Wireless Equipment
40 95 63.13 - Process Control Wireless Transmitters
40 95 63.16 - Process Control Wireless Receivers
40 95 63.19 - Process Control Wireless Repeaters
41 08 30 - Commissioning of Manufacturing Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 08 40 - Commissioning Water Treatment Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 08 00.00.01 - Commissioning of Electrical Power Generation
Share URL copied!
https://www.thebluebook.com/iProView/1421524/sorcar-engineering-inc/engineers/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.