Hudson River Park, Segments 6 & 7

Project Information

Project Location:
New York, NY
Status:
Completed
Structure Type:
Park / Playground

References

Owner:
Hudson River Park Trust

Scope Of Work

 

Muñoz is the civil engineer for the $80 million segments, of a continuous waterfront esplanade along the bulkhead , from West 25th Street to West 59th Street. Project elements include the surface treatment of piers 66, 72, 84, and 97. The piers will have new piles and decking, with accessibility to the public for active or passive recreation. Park improvements include the waterside esplanade, paving, railings, drinking fountains, irrigation systems, plazas, and combined sewer outfalls, which require repair, modification, or reconstruction.

Muñoz provided the verification and location, adequacy and availability of public utilities, drainage system design, and retaining wall design for segments that extend over 9,500 linear feet. We also inspected Combined Sewer Outfalls to determine the impact the project on these DEP structures, given their existing condition.

Services provided included:

Existing Conditions Survey of Site Conditions

Utility location and verification

Inspections of Combined Sewer Outfalls

Site Design for Utility Relocation

Site Design for Drainage System

Design for Paved Areas, Pavers

Project Images

#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1409731/munoz-construction-management-group-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.