Project Information
- Project Location:
- Oplika, AL
- Approx Contract:
- $5,000
- Status:
- In-Progress - Jun 2017
- Structure Type:
- Retail Store
References
- Owner:
- Emcor
- Client:
- DAVID HUGHES - Facility Manager Walmart
Scope Of Work
Install 3/4' White Conduit For Power routing. from Junction Box Above Ceiling to Floor Mounted Junction Box. Drill 3/4 painted White Conduit Oass Through Provoded Support INSTALL A SINGLE GANG JUNCTION BOX WITH NEMA 5-20R DUPLEX RECEPTACLE, RECESSED MOUNT ON TOP CAP OF GONDOLA UTILIZING PRE-KNOCKOUT. LOCAlE AS CLOSED AS POSSIBLE TO THE BOTANICS FIXlURES. RECEPTACLE SHALL HAVE TWO (2) REVOLUTIONS OF El.EC'IRICAL TAPE (SCOTCH 33+) OVER ALL THE TERMINALS TO PREVENT AOODENTAL CONTACT WITH THE JUNC'TION BOX. REMOVE ONE PEGBOARD IN ORDER TO DRILL A HOLE THROUGH GONDOLA CROSS BAR FOR CONDUIT PASS THROUGH. CROSS BAR IS Located BELOW TOP RAIL, IN BETWEEN THE PEGBOARD. DE-MERCHANDISING A 3' SEC'TION OF GONDOLA WILL BE REQUIRED FOR REMOVAL OF PEGBOARD. FLEXIBLE METAL CONDUIT FOR ROUTING OF CONDUCTORS TO NEMA5-2DR DUPLEX RECEPTACLE. RECEPTACLE SHALL BE RECESSED MOUNT ON THE TOP CAP OF GONDOLA, UTILIZING EXISTING PRE-PUNCH KNOCKOUT. PROVIDE A SINGLE GANG JUNC'TION BOX (FASlENED TO THE BOTTOM OF TOP CAP) TO HOUSE RECESSED MOUNT RECEPTACLE. GONDOLA CROSS BAR SHALL BE DRILLED WITH A HOLE FOR FLEXIBLE CONDUIT PASS THROUGH.