Logo

Firmament Solutions

Atlanta, GA 30349

Company Info

  • Est. 2013
  • Annual Vol Not Provided

Featured Project Return to Projects List

Walmart Lab Power Installation

Project Information

Project Location:
Oplika, AL
Approx Contract:
$5,000
Status:
In-Progress - Jun 2017
Structure Type:
Retail Store

References

Owner:
Emcor
Client:
DAVID HUGHES - Facility Manager Walmart

Scope Of Work

Install 3/4' White Conduit For Power routing. from Junction Box Above Ceiling to Floor Mounted Junction Box. Drill 3/4 painted White Conduit Oass Through Provoded Support INSTALL A SINGLE GANG JUNCTION BOX WITH NEMA 5-20R DUPLEX RECEPTACLE, RECESSED MOUNT ON TOP CAP OF GONDOLA UTILIZING PRE-KNOCKOUT. LOCAlE AS CLOSED AS POSSIBLE TO THE BOTANICS FIXlURES. RECEPTACLE SHALL HAVE TWO (2) REVOLUTIONS OF El.EC'IRICAL TAPE (SCOTCH 33+) OVER ALL THE TERMINALS TO PREVENT AOODENTAL CONTACT WITH THE JUNC'TION BOX. REMOVE ONE PEGBOARD IN ORDER TO DRILL A HOLE THROUGH GONDOLA CROSS BAR FOR CONDUIT PASS THROUGH. CROSS BAR IS Located BELOW TOP RAIL, IN BETWEEN THE PEGBOARD. DE-MERCHANDISING A 3' SEC'TION OF GONDOLA WILL BE REQUIRED FOR REMOVAL OF PEGBOARD.  FLEXIBLE METAL CONDUIT FOR ROUTING OF CONDUCTORS TO NEMA5-2DR DUPLEX RECEPTACLE. RECEPTACLE SHALL BE RECESSED MOUNT ON THE TOP CAP OF GONDOLA, UTILIZING EXISTING PRE-PUNCH KNOCKOUT. PROVIDE A SINGLE GANG JUNC'TION BOX (FASlENED TO THE BOTTOM OF TOP CAP) TO HOUSE RECESSED MOUNT RECEPTACLE. GONDOLA CROSS BAR SHALL BE DRILLED WITH A HOLE FOR FLEXIBLE CONDUIT PASS THROUGH.

Project Images

#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1366290/firmament-solutions/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.