Logo

Milender White

Share

Newport Beach, CA 92660

Company Info

  • Est. 1997
  • Size 100-249 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Neon - Lenior landing

Project Information

Project Location:
Gilbertown, AL
Status:
Completed
Structure Type:
Misc Project

References

Owner:
National Ecological Observation Network(NEON)
Architect:
Leo A Daly

Scope Of Work

Milender White erected a 149-ft guyed scientific data collection tower and instrument hut deep within the Choctaw National Wildlife Refuge in southwest Alabama. Building the ecological data gathering facility in the dense forest wetlands during spring flooding presented formidable challenges.

The tower is equipped with scientific monitoring equipment and an adjacent instrument hut houses sensitive data collection tools. The area immediately surrounding the tower and instrument hut was preserved to maintain the environmental integrity of the area during construction.

Elevated boardwalk totaling 1,150-ft begins just inside of the site entrance and leads to the instrument hut, the tower and out to (5) soil array plots. Flexible, liquid-tight conduit, mounted in a raceway on the underside of the boardwalk delivers power and data services to the instrument hut electrical panel. Branch circuit conduits extend power from the instrument hut panel out to the tower and the soil arrays.

2015 - Award of Excellence, Other Construction: Less than $2 million
Associated Builders & Contractors, Inc.

2015 - Free Enterprise Award
Associated Builders & Contractors, Inc.

Share URL copied!
https://www.thebluebook.com/iProView/1365677/milender-white/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.