Featured Project Return to Projects List
Orange Theory Fitness
Project Information
- Project Location:
- Fort Collins, CO
- Approx Contract:
- $50,000
- Status:
- In-Progress - Jun 2017
- Structure Type:
- Fitness Center
References
- Owner:
- Evolve 360 LLC
- Architect:
- ZAR Designs
- General Contractor:
- D&R Construction Co., Inc.
- Client:
-
Dave
Ragsdale
-
Project Manager
(303) 657-8500D&R Construction Co., Inc.
Scope Of Work
· Provide and install curb for RTU #3
· Provide and install RTU #3 as per plan
· Fabricate and install ductwork and piping as per plan
· Provide and install EF-1,EF-2, as per plan
· Provide and install DH-1, DH-2 –Therma-Stor HI-E DRY 195-Floor Design
· Provide and install GRD's as per plan
· Provide start up for RTU #3
· Provide start up for existing RTU #1,RTU #2. Generate condition report to for GC. Repairs needed / approved will be at standard rates plus material
· Provide NEBB certified test and balance
· Excludes: electrical power connections and gas piping