Scope Of Work
This project consisted of installing 1200 Linear Feet (LF) of 30-inch ductile iron pipe and 100 LF of 42-inch HDPE, dredging of the marina, as well as part of the lake and constructing settling ponds for the dredged material. The project also included 37-foot-deep excavation for a wet well and 25-foot-deep excavation of the 42 inch HDPE.
COP also constructed a new pump station consisting of four new 10 inch pumps with mechanical pipe, including two self-cleaning amiad filters. A new intake structure, with 30-inch SS wire screens and air burst systems, was also installed.
DURATION: 12 months
COST: $5,318,491