Icy Springs Bridge

Project Information

Project Location:
MT
Approx Contract:
$1,000,000
Status:
Completed
Structure Type:
Bridge

References

Client:
UDOT

Scope Of Work

This project consisted of removal of the existing bridge and replacement with a new bridge structure. The bridge substructure elements are all precast including abutments, wing walls, sleeper beams and approach slab sections. The bridge also includes 5 new pre-stressed concrete single bulb tee girders. The new bridge structure required the installation of a cofferdam to divert the Weber River. The job also included new catch basins and storm drain piping, final surface grading and rip rap.

DURATION: 7 months

COST: $1,015,095

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1321443/cop-construction-llc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.