Icy Springs Bridge
Project Information
- Project Location:
- MT
- Approx Contract:
- $1,000,000
- Status:
- Completed
- Structure Type:
- Bridge
References
- Client:
- UDOT
Scope Of Work
This project consisted of removal of the existing bridge and replacement with a new bridge structure. The bridge substructure elements are all precast including abutments, wing walls, sleeper beams and approach slab sections. The bridge also includes 5 new pre-stressed concrete single bulb tee girders. The new bridge structure required the installation of a cofferdam to divert the Weber River. The job also included new catch basins and storm drain piping, final surface grading and rip rap.
DURATION: 7 months
COST: $1,015,095