EAA A-1 Flow Equalization — South Bay
Project Information
- Project Location:
- FL
- Approx Contract:
- $60,000,000
- Status:
- Completed - Jun 2016
- Structure Type:
- Utilities
References
- Owner:
- South Florida Water Mgmt. District
- General Contractor:
- Central Civil Construction
Scope Of Work
Project highlights include an overall project area of 15,000 acres, the EAA A-1 Flow Equalization (FEB) is designed to capture and store peak stormwater flows during the wet season or heavy rainfall events. The project encompasses installation of 2.1 million Cubic Yards of fill to construct 21 miles of levee, degrading 3.1 million Cubic Yards of muck, backfilling 113 miles of agricultural canals and construction of 14 gated water control structures.