Logo

Mass. Electric Construction Co.

Greenbelt, MD 20770

Company Info

  • Est. 1928
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Iatan Coal-Fired Power Plant

Project Information

Project Location:
Weston, MO
Status:
Completed
Structure Type:
Manufacturing Plant

Scope Of Work

MEC managed crews on electrical installations at the Iatan Coal-Fired Power Plant. Crews constructed and installed the Air Quality Control System (back-end or AQCS) for the existing 651 MW Unit I plant, and worked on the construction of major components for a new, 850 MW Unit II, including the Steam Turbine, Boiler, AQCS, and balance of plant (BOP) electrical work.

Since June 2007, working with and around several other trades and contractors, MEC had 45-50 staff constantly on-site, managing local union electricians on the installation of:

Switchgear

Seven (7) major power control module buildings (PCM)

High voltage bus work

Over 550,000 feet of conduit raceway

Approximately 65,000 feet of cable tray

Over five (5) million feet of power, control, and instrumentation cabling

More than 124,000 wire terminations

To complete this project in the time scheduled, many challenges were overcome. The main challenge that MEC successfully overcame was the installation of cables in a multi-tiered complex cable tray system, which was located within many areas of limited, difficult access.

Share URL copied!
https://www.thebluebook.com/iProView/1300286/mass-electric-construction-co/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.