Logo

Mass. Electric Construction Co.

Greenbelt, MD 20770

Company Info

  • Est. 1928
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

El Pico Surface Water Treatment Plant

Project Information

Project Location:
Laredo, TX
Status:
Completed
Structure Type:
Manufacturing Plant

Scope Of Work

The El Pico Surface Water Treatment Plant (SWTP) is a 20MDG surface water treatment plant which extracts water from the Rio Grande River, and distributes the potable water to the City of Laredo, Texas. The plant was engineered with an expandable infrastructure to eventually support up to an 80MGD capacity. Work began on the new plant in December 2011 and was completed in December 2013.

MEC constructed all the electrical systems for the plant, including:

power & distribution equipment

low voltage raceway and cabling

instrumentation & control system

medium voltage equipment and cabling

communication system

security & fire alarm systems

lightning protection for the plant

The systems required the installation of under & above ground conduit with associated supports & accessories, junction and pull boxes, electrical distribution equipment, panel boards, disconnects, 600V cable and building wire, instrumentation and control cable, 600V terminations and instrumentation and control cable terminations.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1300286/mass-electric-construction-co/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.