Brio Tustin Grill
Project Information
- Project Location:
- Rancho Cucumanga, CA
- Approx Contract:
- $85,000
- Status:
- Completed - Jul 2014
- Structure Type:
- Restaurant
- LEED Certification (target):
-
Gold
References
- Owner:
- Brio Grill
- Architect:
- Richard Siegrfried Architect, Inc
- General Contractor:
- Mike Peterson Construction
Scope Of Work
Installation of LVT tile around bar and high traffic areas. Stack stone on bathroom walls and entry to bathroom. Wall slate outside and three seperate brick walls inside.Standard glue down carpet instulation White tile in both bathroom walls. Travertine on a 45 degree angle with boarder and dots. Hardwood for ceilings installed in a 30 ft ceiling. Outside slate wall tile in a pattern.