Logo

Skanska USA Buildings

Phoenix, AZ 85004

Company Info

  • Est. 1887
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Center for Integration of Molecular Imaging and Therapeutics (CIMIT) MRI Installation

Project Information

Project Location:
Baltimore, TX
Status:
Completed - Jan 2014
Structure Type:
Hospital / Nursing Home

Scope Of Work

This project includes preconstruction and construction management services for very complex 2,000-SF of clinical equipment space. This project was centered around the installation of a new GE 3T MRI, Insitech MR Guided Focused Ultrasound, and GE Hyperpolarizer Spin Lab in an existing Radiology suite in UMMC’s Weinberg/IPHB building. The suite was surrounded by occupied and heavily used corridors and departments. This project included auxiliary research equipment utilizing the GE platform. Radio/frequency, magnetic, acoustic and vibration shielding was required by this project as well as utility and structural upgrades to the existing infrastructure. Design and construction was completed within a tight schedule under seven months.

Project Challenge
There was a unique challenge in that the new MRI space sat on the line where two buildings came together. Although close to the loading dock, very intricate down-to-the-hour scheduling was required with multiple stakeholders including the hospital, GE, multiple subcontractors, and design team for the MRI delivery, including scaffolding two levels down to the foundation since the building was unable to withstand the weight of the MRI on the delivery path. The delivery was ultimately successful.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1232089/skanska-usa-buildings/engineers/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.