Logo

Cobblestone Construction

Share

Las Vegas, NV 89108

Company Info

  • Est. 1998
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Parts Store Facility – Davis-Monthan AFB, AZ

Project Information

Project Location:
AZ
Approx Contract:
$6,000,000
Status:
Completed
Structure Type:
Storage Facility / Warehouse
LEED Certification (target):
Gold

References

Owner:
US Army Corp of Engineers

Scope Of Work

Scope: Benchmark Contracting, Inc. dba Cobblestone Construction designed and constructed a new Parts Store Facility with structural metal and split face block exterior, reinforced concrete foundation and floor slab, structural steel frame and standing seam metal roof. Also included in the construction are screen walls, concrete facility aprons, walkways, communication support, pavement demolishment and all other necessary supporting facilities for a complete and usable facility. Supporting facilities include all utilities services, site lighting, fire protection and alarm systems, lightning protection, storm drainage, parking, information systems, 60 ton air conditioning system, and site improvements. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features were incorporated. This project complied with DOD Anti-Terrorism/Force Protection requirements per UFC4-010-01 and was  Gold Certified under the USGBC -NC v2.2 Rating System. Sustainable principals, to include Life Cycle cost-effective practices, were integrated into the design, development, and cost of the project.

Share URL copied!
https://www.thebluebook.com/iProView/1218913/cobblestone-construction/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.