Logo

Cobblestone Construction

Share

Las Vegas, NV 89108

Company Info

  • Est. 1998
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

McCarran International Airport – CB2 Rotunda – Terminal Remodel

Project Information

Project Location:
Las Vegas, NV
Status:
Completed
Structure Type:
Terminal - Airport / Bus / Railroad

Scope Of Work

This is a very complex project that clearly displays the multifaceted abilities of Benchmark Contracting, Inc. dba Cobblestone Construction. This project is a complete remodel to an airport concourse that supports several airlines, flight gates, retailers, vendors, and travelers. Due to the size of the project and work constraints associated with airport operations it was divided into 3 phases: Building Remodel, Lavatory Remodel and Rooftop Crossovers. For the Building Remodel the contract required the removal of the floor and ceiling finishes, new metal and gypsum ceiling and light, carpet installation, removal and replacement window walls, removal and replacement of HVAC system, rework of existing fire sprinkler system, security detection and alarms, painting, architectural casework, scaffolding and protection-in-place of tenant improvement. All of which were performed without disruption of flights. The Lavatory Remodel required the demolition and refinishing of dual restrooms, 1,200 square feet each, new plumbing, fixtures, finishes, lighting and HVAC ductwork and terminations. Rooftop Crossovers involved providing and installing 12 manufactured galvanized crossover systems over existing roof mounted ductwork, plus three elevated walkways.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1218913/cobblestone-construction/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.