A
Featured Project Return to Projects List
Dallas North Tollway North
Project Information
- Project Location:
- Plano, TX
- Status:
- Completed
- Structure Type:
- Road / Highway
Scope Of Work
Austin Bridge & Road completed construction on the Dallas North Tollway North (DNT) from Haverwood Lane to South of Parker Road. The 2.3-mile project included widening the existing six-lane road to eight lanes, two new connector bridges from President George Bush Turnpike to DNT, along with new ramps in a braided format, drainage, walls, and concrete paving.