Logo

Balfour Beatty Infrastructure, Inc.

Share

West Covina, CA 91790

Company Info

  • Annual Vol Not Provided

Featured Project Return to Projects List

Infrastructure Project

Project Information

Project Location:
Bridgeport, CT
Approx Contract:
$105
Status:
Completed - Oct 2003
Structure Type:
Misc Project

References

Owner:
Bridgeport I-95
Architect:
General Contractor:
Balfour Beatty Infrastructure, Inc.

Scope Of Work

An important part of the I-95 artery between New York City and Boston, the Bridgeport Corridor required upgrading to improve traffic flow and safety. The Connecticut Department of Transportation launched a major program to modify the I-95 roadway cross section and realign other sections of the road. Balfour Beatty Infrastructure, Inc. contracted to perform work on the "Orange" portion of the reconstruction program, a $105.9 million project.

The "Orange" project involved reconstructing about five lane miles, five exit/entrance ramps and several local roads. Several bridges were built over local roads and one was constructed over the Metro-North Railroad across electrified railway lines.

The contract called for staged construction methods as a means to keep traffic flowing while each bridge structure was being replaced, which Balfour Beatty Infrastructure successfully accomplished.

Share URL copied!
https://www.thebluebook.com/iProView/1196478/balfour-beatty-infrastructure-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.