Mt. Graham—MGIO kV Power Line

Project Information

Project Location:
Tucson, AZ
Approx Contract:
$6,411,204
Status:
Completed
Structure Type:
Power Generation & Distribution

References

Owner:
Arizona Board of Regents, University of Arizona
Architect:
Not Available
General Contractor:
Not Available

Scope Of Work

Granite installed a 23-mile, 25-kilovolt three-phase underground power line, which has been used to place three large telescopes on commercial power instead of diesel generator power. The power line started at an elevation of 5,500 feet and continued upward to 10,500 feet at the telescope site. Due to the terrain, all access through the corridor was by tracked equipment or by foot. A tracked excavator pulled along a small screen to process material, which was used as a cable bedding and shading.

 

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1191135/granite-construction-inc/material-suppliers/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.