Logo

The Walsh Group

Share

Seattle, WA 98188

Company Info

  • Est. 1898
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Allegheny River Bridge

Project Information

Project Location:
Cheswick, PA
Approx Contract:
$200,000,000
Status:
Completed
Structure Type:
Bridge

References

Owner:
Pennsylvania Turnpike Commission
Architect:
Figg Engineers

Scope Of Work

This project features twin 2,350’ cast-in-place concrete segmental bridges carrying The Pennsylvania Turnpike over the Allegheny River, Allegheny Valley Railroad, Norfolk Southern Railroad, and Freeport Road. These structures were constructed utilizing the balanced cantilever method and are the first of their kind in Pennsylvania. The six-span structures have piers ranging in height from 57’ to 102’ which include aesthetic rockwork features inspired by the local landscape, over 8,000,000 pounds of reinforcing steel, 1300 LF of drilled shafts, nearly 50,000 CY of concrete, and over 3,000,000 pounds of post-tensioning.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/1185440/the-walsh-group/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.