Geo-Advantec, Inc.
San Dimas, CA 91773
Featured Project Return to Projects List
Eastern Avenue Pavement Rehabilitation
Project Information
- Project Location:
- Commerce, CA
- Status:
- Completed - Jan 2015
- Structure Type:
- Misc Project
Scope Of Work
Eastern Avenue carries a high volume of vehicular and truck traffic. The project included one mile stretch of pavement from Steven’s Steakhouse to the city limits on Bandini Boulevard. In addition, the Annual Sidewalk Maintenance Program repaired approximately 700 feet sidewalk displacements throughout the entire city. Based on the studies performed by Geo-Advantec, different rehabilitation alternatives were suggested and due to the time limitations, as well as economy of the project, the Full Depth Reclamation (FDR) alternative was selected. The pavement section comprised of HMA over 3 inches of Cold Central Plant Recycled (CCPR) asphalt being supported on 16 inches of Reclaimed Cement Treated Base (RCTB) was selected.
Geo-Advantec performed geotechnical/pavement engineering study and provided during construction services including laboratory materials testing and field inspection on all facets of the work, i.e. reclaimed cement treated base layer, reclaimed asphalt and the capping HMA.