Logo

West End Plumbing

Sunrise, FL 33351

Company Info

  • Est. 1980
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Sephora - Sawgrass Mills Mall

Project Information

Project Location:
Sunrise, FL
Status:
Completed - Mar 2019
Structure Type:
Retail Store

References

Owner:
Sephora, U.S.A.
Architect:
BAI Architecture
General Contractor:
Management Resource Systems, Inc

Scope Of Work

SCOPE OF WORK:

-ALL DOMESTIC WATER PIPING WILL BE RUN IN "L" COPPER. 
-ALL SANITARY WASTE PIPING WILL BE IN "CAST IRON".
-CONNECT NEW 1 ½” COLD WATER LINE INTO EXISTING WATER LINE.
-CONNECT NEW 4” SANITARY LINE INTO THE EXISTING SANITARY SERVICE.
-CONNECT NEW 2” VENT LINE FROM FIXTURES INTO EXISTING VENT LINE.
-PROVIDE AND INSTALL A ¼” WATER LINE FROM SK-1 TO OUTLET BOX FOR WATER COOLER SHOW ON PLANS.
-FURNISH AND INSTALL WATER HAMMER ARRESTORS IN DOMESTIC HOT AND COLD WATER PIPING AS PER PLANS.
-ALL PLUMBING FIXTURES SHALL BE INSTALLED WITH STOP VALVES TO ISOLATE EACH FIXTURE.
-FURNISH AND INSTALL ALL FIXTURES AS SPECIFIED ON PLUMBING FIXTURE SCHEDULE.
-FURNISH AND INSTALL CONDENSATE LINES FROM (4) EXISTING UNITS TO MOP SINK.
-CONDENSATE LINES SHALL BE IN “M” COPPER PIPE.
-FURNISH AND INSTALL INSULATION FOR CONDENSATE LINES.


 

Share URL copied!
https://www.thebluebook.com/iProView/1171688/west-end-plumbing/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.