Logo

D-Line Constructors

Share

Oakland, CA 94606

Company Info

  • Est. 2009
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Stanford Linear Accelerator

Project Information

Project Location:
Oakland, CA
Approx Contract:
$3,000,000
Status:
Completed
Structure Type:
Laboratory

Scope Of Work

Relocation of existing 12kV duct bank; mechanical, low conductivity, and domestic water lines from a depth of 21’ deep to 6’ below grade, in preparation for the construction of a future drilled tunnel. Work included: Excavation, shoring, and installation of 12kV duct bank, 18” cooling tower water, 10” domestic water, and 2” low conductivity water lines; installation of a pre-cast concrete manhole; coordination of 2 (ea) electrical shutdowns and re-routing of electrical systems in lieu of providing above grade temporary power; installation of fiber optic cable; backfill for future tunnel boring with Control Density Fill; backfill with approved soils; installation of concrete pad and asphalt patthway; restoration of pavement and concrete surfaces; and restoration of landscaped areas.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1165118/d-line-constructors/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.