Logo

Structural Associates, Inc.

Share

Watertown, NY 13601

Home Contact Us

Company Info

  • Est. 1975
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Replace Hydrant Fuel System

Project Information

Project Location:
Martinsburg, WV
Approx Contract:
$20,000,000
Status:
Completed
Structure Type:
Gas Station

Scope Of Work

SAI was awarded this “best value” firm fixed price contract to perform the construction of a new 1,200 gpm Type III aircraft fueling system at the 167th Airlift Wing; Martinsburg, WV.  This hydrant fueling system and parking apron for the 167th Airlift Wing of the West Virginia Air National Guard was part of a facility upgrade to support the deployment of C5 aircraft to this facility that included:

Construction of a new 1,200 gpm pump house

Construction of a new Operations Control Building, truck fill station, truck loading and unloading stations, two 6,500 barrel above ground fuel storage tanks, glycol storage and dispensing system, LOX/LIN storage building and a diesel/mogas storage and dispensing facility

Installation of approximately 2,900 lf of 8″ and 10″ aboveground and underground welded stainless steel and carbon steel piping, connection to the existing hydrant loop and extension of the existing hydrant loop to the new paring apron

Construction of a 250,000 sf concrete aircraft parking apron

In addition to the exterior coatings applied to the fuel piping all underground piping is further protected from corrosion through installation of an impressed current cathodic protection system.

This new Type III hydrant refueling system permits direct refueling of aircraft from apron hydrant fuel pits as well as fuel truck unloading and loading capability.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/1127066/structural-associates-inc/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.