NASA Canal Water Pump Project Housed at Building 2311

Scope Of Work:

The project consisted of the replacement of three 25,000 gallon per minute turbine pumps, piping, valves and the Motor Control Center for the pumps. The pumps fill the barge canal reservoir that is utilized for the rocket test mission of Stennis Space Center, MS.

Approx Contract: Not Provided