Riverbank Stabilization at Valley Railway MP 53.78
Project Information
- Project Location:
- Brecksville, OH
- Approx Contract:
- $200,000
- Status:
- Completed
- Structure Type:
- Terminal - Airport / Bus / Railroad
Scope Of Work
DESCRIPTION OF WORK: Work consisted of site preparation. Individual trees were removed as well as debris. The bank was excavated. Shoulder Ballast was replaced. Channel protection stone B and C was placed as well as AASHTO M-57 stone and turf reinforcing mat type 1. Select fill and topsoil added. Everything was seeded, fertilized, and mulched. Dormant live stakes were also placed at the end of the project.