Logo

Auburn Constructors, Inc.

Share

Sacramento, CA 95834

Company Info

  • Est. 1990
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Dry Creek Wastewater Treatment Plant Cooling Towers

Project Information

Project Location:
Roseville, CA
Approx Contract:
$4,000,000
Status:
Completed - Jan 2004
Structure Type:
Tunnel

References

Owner:
City of Roseville, CA

Scope Of Work

This design-build project consisted of the installation of evaporative cooling units at the City of Roseville’s Dry Creek WWTP. These towers were used to cool tertiary treated effluent prior to discharge. The facilities include four cooling units, each of which cools 4.2 MGD of secondary effluent, and facilities were sized to allow expansion to 16 cooling units. Connection of the units into the existing WWTP included design of 72” welded steel pipe and construction sequencing to minimize plant down time. Control and monitoring of the new facilities and power consumption/quality was integrated with the existing plant’s SCADA system.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1118222/auburn-constructors-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.