K
Knowles Industrial Services Corp.
Gorham, ME 04038
People Also View These
Loading...
Our Story
Our main lines of business include: Mason Contractors, Coatings & Linings--Pipe & Tank, Concrete Repair & Restoration Contrs., Floor Treatments/Coatings/Preservatives, Grouting--Pressure, Gunite & Shotcrete Construction.
Knowles Industrial Services Corp. has been listed in the Blue Book since 2010.
Regions & Counties Serviced
- Maine, Vermont
Maine 1
- Cumberland
Our CSI Codes
01 56 13 - Temporary Air Barriers
01 93 13 - Facility Maintenance Procedures
02 01 80 - Maintenance of Facility Remediation
02 26 26 - Lead Assessment
02 51 29.13 - High-Pressure Water Cleaning Decontamination
02 51 33 - Surface Removal Decontamination
02 51 33.13 - Surface Removal Decontamination by Grinding
02 51 33.16 - Surface Removal Decontamination by Sand Blasting
02 51 33.19 - Surface Removal Decontamination by Ultrasound
02 57 13 - Sinkhole Remediation by Grouting
02 57 13.13 - Sinkhole Remediation by Compaction Grouting
02 57 13.16 - Sinkhole Remediation by Cap Grouting
02 83 13 - Lead Hazard Control Activities
02 83 19 - Lead-Based Paint Remediation
02 83 19.13 - Lead-Based Paint Abatement
02 83 33 - Removal and Disposal of Material Containing Lead
02 83 33.13 - Lead-Based Paint Removal and Disposal
03 01 30.51 - Cleaning of Cast-in-Place Concrete
03 01 30.61 - Resurfacing of Cast-in-Place Concrete
03 01 30.71 - Rehabilitation of Cast-in-Place Concrete
03 01 40.51 - Cleaning of Precast Concrete
03 01 40.61 - Resurfacing of Precast Concrete
03 01 40.71 - Rehabilitation of Precast Concrete
03 01 60 - Maintenance of Grouting
03 06 60 - Schedules for Grouting
03 35 13 - High-Tolerance Concrete Floor Finishing
03 37 13 - Shotcrete
03 61 13 - Dry-Pack Grouting
03 62 13 - Non-Metallic Non-Shrink Grouting
03 62 16 - Metallic Non-Shrink Grouting
03 64 23 - Epoxy Injection Grouting
04 01 20 - Maintenance of Unit Masonry
04 01 20.51 - Unit Masonry Maintenance
04 01 20.52 - Unit Masonry Cleaning
04 01 60 - Maintenance of Corrosion-Resistant Masonry
04 01 70 - Maintenance of Manufactured Masonry
04 05 16 - Masonry Grouting
04 05 16.16 - Chemical-Resistant Masonry Grouting
04 05 16.26 - Engineered Masonry Grouting
04 06 20 - Schedules for Unit Masonry
04 06 20.13 - Masonry Unit Schedule
04 06 60 - Schedules for Corrosion-Resistant Masonry
04 57 00.00.01 - Masonry Fireplaces
07 01 10 - Maintenance of Dampproofing and Waterproofing
07 06 10 - Schedules for Dampproofing and Waterproofing
07 18 13 - Pedestrian Traffic Coatings
07 25 00.00.01 - Weather Barriers
07 26 13 - Above-Grade Vapor Retarders
07 26 16 - Below-Grade Vapor Retarders
07 26 23 - Below-Grade Gas Retarders
07 27 13 - Modified Bituminous Sheet Air Barriers
07 27 16 - Sheet Metal Membrane Air Barriers
07 27 19 - Plastic Sheet Air Barriers
07 27 23 - Board Product Air Barriers
07 27 26 - Fluid-Applied Membrane Air Barriers
09 01 60 - Maintenance of Flooring
09 60 00.00.01 - Flooring
09 61 13 - Slip-Resistant Flooring Treatment
09 62 26 - Leather Flooring
09 67 19 - Magnesium-Oxychloride Flooring
09 96 35 - Chemical-Resistant Coatings
09 96 53 - Elastomeric Coatings
09 97 13 - Steel Coatings
09 97 13.13 - Interior Steel Coatings
09 97 13.23 - Exterior Steel Coatings
09 97 26.13 - Interior Cementitious Coatings
10 74 43 - Below-Grade Egress Assemblies
12 11 23 - Brick Murals
13 49 19 - Lead-Lined Materials
26 42 16 - Passive Cathodic Protection for Underground Storage Tank
31 01 70.61 - Tunnel Leak Repairs
31 32 23 - Pressure Grouting Soil Stabilization
31 32 23.13 - Cementitious Pressure Grouting Soil Stabilization
31 32 23.16 - Chemical Pressure Grouting Soil Stabilization
31 32 36.16 - Grouted Soil Nailing
31 32 36.23 - Jet-Grouted Soil Nailing
31 32 36.26 - Launched Soil Nailing
31 33 13 - Rock Bolting and Grouting
31 33 33 - Shotcrete Rock Slope Stabilization
31 43 13 - Pressure Grouting
31 43 13.13 - Concrete Pressure Grouting
31 43 13.16 - Polyurethane Pressure Grouting
31 43 16 - Compaction Grouting
31 62 13.26 - Pressure-Injected Footings
31 73 13 - Cement Tunnel Grouting
31 73 16 - Chemical Tunnel Grouting
31 74 19 - Shotcrete Tunnel Lining
33 01 30.61 - Sewer and Pipe Joint Sealing
33 01 30.62 - Manhole Grout Sealing
33 01 30.72 - Relining Sewers
33 01 50.71 - Lining of Steel Fuel-Storage Tanks
35 49 13.16 - Masonry Floodwalls
40 46 16 - Coatings and Wrappings for Process Corrosion Protection
41 01 40 - Operation and Maintenance of Container Processing and Packaging
41 01 60 - Operation and Maintenance of Mobile Plant Equipment
41 06 40 - Schedules for Container Processing and Packaging
41 06 50 - Schedules for Material Storage
41 06 60 - Schedules for Mobile Plant Equipment
41 08 10 - Commissioning of Bulk Material Processing Equipment
41 08 20 - Commissioning of Piece Material Handling Equipment
41 08 40 - Commissioning of Container Processing and Packaging
41 08 50 - Commissioning of Material Storage
41 08 60 - Commissioning of Mobile Plant Equipment
41 36 23.16 - High-Pressure Water Cutting Equipment
43 01 30 - Operation and Maintenance of Gas and Liquid Hi-Purification Equipment