Featured Project Return to Projects List
Watkins Elementary Schools
Project Information
- Project Location:
- Washington, DC
- Status:
- Completed - Jun 2015
- Structure Type:
- School / College / University
Scope Of Work
DVC replaced all of the windows, sills, interior sills at two DC Elementary Schools (Houston and Watkins ES). The scope of this project encompassed alterations and repair, including the creation of test demolition to probe for potential hazardous materials, and then a mock-up window installation to verify placement of the new windows and sills. The Houston ES project was completed within a six-week timeframe, on the planned fast track. The school was operating and functioning during the renovation, which was performed at a rate of two-classrooms at a time