Advanced Global Construction, Inc.

Ashburn, VA 20147

Company Info

  • Est. 2006
  • Size 20-49 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

AGC’s philosophy is to design, build and deliver projects that exceed the customer’s expectations on every level. By using a total team approach, AGC coordinates the efforts of all aspects of the project to ensure a smooth path to a successful completion. Each team is comprised of the customer, architect, engineers, and project managers, as well as the on-site supervisors and workers. Always placing the customer first, the other members strive to work in concert to fulfill the common vision and goal.

AGC professionals pride themselves on decades of experience within the commercial construction and SCIF building industries. It is with that same pride the organization notes the following designations and achievements:

     • Project leaders are experienced and seasoned professionals

     • Consistently meets and exceeds mission requirements

     • Has successfully completed over 100-plus facilities world-wide

     • AGC’s employees are United States citizens

   
AGC takes its responsibility to manage each project seriously, never compromising the quality of any phase of the project. From inception to completion, our goal is to deliver an on-time, in-budget product that exceeds the customer’s expectations.

What We Do

Regions & Counties Serviced

  • Washington D.C.

Virginia All

Our CSI Codes

08 34 46 - Radio-Frequency-Interference Shielding Doors
08 56 46 - Radio-Frequency-Interference Shielding Windows
25 05 26 - Grounding and Bonding for Integrated Automation
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 13 - Medium-Voltage Cutouts
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 05 26 - Grounding and Bonding for Communications Systems
27 53 16 - Infrared and Radio Frequency Tracking Systems
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 81 23 - Aerial Cable Installation Hardware
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
40 95 73 - Process Control Wiring

Project Experience

  • Non-Union
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Interior Fit-Ups
  • Service Work/Repairs
  • Projects From $2,000,000 and above

Gallery

Featured Image 1
Pacos Memorial Hospital
Featured Image 2
Pacos Memorial Hospital
Featured Image 3
Projects
Featured Image 4
Pacos Memorial Hospital
Share URL copied!
https://www.thebluebook.com/iProView/1055548/advanced-global-construction-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.