Logo

Astro Metal Craft

Hanover, MN 55341

Company Info

  • Est. 1987
  • Size 20-49 Employees
  • DUNS # 079140668

Featured Project Return to Projects List

Vega Picket Aluminum Guardrail

Project Information

Project Location:
Seattle, WA
Approx Contract:
$800,000
Status:
Completed - Sep 2015
Structure Type:
Road / Highway

References

Owner:
University of Washington Montlake project.
Architect:
LMN Architects
General Contractor:
ISEC

Scope Of Work

This aluminum picket-style railing consisted of approximately 2300 linear feet of railing in various heights up to 6 feet. After careful planning and efficient production time, it took about six months from the first drawings to railway delivery. Astro took care of engineering and field verification while meeting demanding schedules and coordinating with highway shutdowns. Despite these obstacles, we were able to produce quality aluminum railings in a timely manner.

Conditions:

The project site was over an active street, so surveying and installation work could only be performed in pre-scheduled shutdown windows.

The end user required a 20 year warranty on the paint.

The railings needed to be engineered to be both strong and lightweight to meet code requirements.

Project specification required certified welding.

Rails need to be built to follow both the pitch and the curve of the site.

The site was located out of state 1500 miles away.

Solutions:

We modeled our customers design concept and worked with an engineer to guarantee it met the projects code requirements.

We obtained a sight survey that used electronic instruments to log digital data points that were uploaded into our modeling software. Using this model with real life data points, we were able to design the railing system to fit the site perfectly. Our customer was able to view our 3-D model in advanced, and approve the design before fabrication began.

We provided workmanship standard samples, as well as certified welding documentation to give the customer peace of mind that the railings would meet there specifications.

We worked with an (aluminum) extruder to provide custom size and shape extrusions to fit the design requirements and stay within budget.

We developed a streamlined robust production process to provide a quick turnaround and consistent quality.

We fabricated the rails in batches to meet a predetermined installation schedule.

We contracted a painter with a 20 year warranty paint system to paint the railings.

We had a dedicated project manager overseeing the project, who was able to respond promptly to any of the customers question.

Customer Reaction:

“I wanted to take time out from my schedule to express my appreciation for the wonderful job Astro did for on the University of Washington Montlake project. ISEC has had the distinct pleasure of working with this thoroughly professional company, who cared about their work on this fast paced project; the attention to detail, professional approach to problem solving and positive attitude made the process seamless. ISEC looks forward to working with Astro again in the very near future on any projects that require superior metals work.” – Jesse Maddox, Project Manager, ISEC

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1029621/astro-metal-craft/manufacturers/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.