Amcor Loading Dock / Driveway Concrete Replacement

Project Information

Project Location:
Appleton, WI
Status:
Completed - May 2020
Structure Type:
Misc Project

References

Owner:
Amcor
General Contractor:
Keller Builds

Scope Of Work

  • This was a Project that had to be done in a specific time due to Semi trucks coming in and out for Freight. The Driveway & Loading Ramp was shutdown for a couple days for everything to be demoed for Construction and poured with Concrete. For the driveway, we poured Concrete up to the existing blacktop that was on site. 
  • The Concrete mixes we used was a DOT A 4,000 psi & DOT C 5,000 psi mix that would make the driveway able to be driven on in 3 days. With the DOT C mix design, finishing became challenging at times due to the warmer temperatures, sun, and wind. The Driveway & Ramp were poured at 8" thick with Forta Ferro reinforcement. We screeded with our Somero S940 Laser Screed equipped with 3D Profiler System.

Project Images

#
#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1010630/spiegelberg-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.