S
ShureLine Construction
Kenton, DE 19955
People Also View These
Loading...
Our Story
Our main lines of business include: Electrical Contractors, Mechanical Contractors.
ShureLine Construction has been listed in the Blue Book since 2007.
What We Do
Regions & Counties Serviced
- Pennsylvania-Eastern
Delaware 1
- New Castle
Our CSI Codes
05 10 00.00.01 - Structural Metal Framing
05 12 13 - Architecturally-Exposed Structural Steel Framing
05 12 16 - Fabricated Fireproofed Steel Columns
05 12 23 - Structural Steel for Buildings
05 12 33 - Structural Steel for Bridges
05 13 00.00.01 - Structural Stainless-Steel Framing
05 20 00.00.01 - Metal Joists
05 21 13 - Deep Longspan Steel Joist Framing
05 21 16 - Longspan Steel Joist Framing
05 21 19 - Open Web Steel Joist Framing
05 21 23 - Steel Joist Girder Framing
05 30 00.00.01 - Metal Decking
05 31 13 - Steel Floor Decking
05 31 23 - Steel Roof Decking
05 31 33 - Steel Form Decking
05 34 00.00.01 - Acoustical Metal Decking
05 36 13 - Composite Steel Plate and Elastomer Decking
05 43 00.00.01 - Slotted Channel Framing
05 45 13 - Mechanical Metal Supports
05 45 16 - Electrical Metal Supports
05 45 19 - Communications Metal Supports
05 45 23 - Healthcare Metal Supports
05 50 00.00.01 - Metal Fabrications
05 51 13 - Metal Pan Stairs
05 51 16 - Metal Floor Plate Stairs
05 51 19 - Metal Grating Stairs
05 51 23 - Metal Fire Escapes
05 51 33 - Metal Ladders
05 51 33.13 - Vertical Metal Ladders
05 51 33.16 - Inclined Metal Ladders
05 51 33.23 - Alternating Tread Ladders
05 51 36 - Catwalks
05 51 36.13 - Metal Catwalks
05 52 13 - Pipe and Tube Railings
05 53 00.00.01 - Metal Gratings
05 54 00.00.01 - Metal Floor Plates
05 55 13 - Metal Stair Treads
05 55 16 - Metal Stair Nosings
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 13 - Medium-Voltage Cutouts
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 05 26 - Grounding and Bonding for Communications Systems
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 81 23 - Aerial Cable Installation Hardware
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
40 95 73 - Process Control Wiring