Featured Project Return to Projects List

Marriott Harbor Beach Restoration

Project Information

Project Location:
Ft. Lauderdale, FL
Approx Contract:
$3,000,000
Status:
Completed
Structure Type:
Hotel / Motel

References

Owner:
Host Hotels & Resorts, Inc.
Architect:
EDSA, Inc.

Scope Of Work

Problem

The purpose of this project was to update, renovate and waterproof the Marriott Harbor Beach Ocean Terrace, which was built in 1983 and is one of the most popular hotels of the Host Hotel & Resort family. It had a dated appearance and it was not being used to its full potential by the hotel and guests. There were leaks into the underground parking garage, administrative offices, and storage rooms due to failed waterproofing. The plan was two-fold. Stop the leaks and produce an aesthetically pleasing and versatile, multipurpose terrace. A national architectural firm was hired to design a more modern, open space and by October 2008 the restoration was underway.

Solution
Demolition of walkways and existing concrete surface slabs as well as removal of
planters, walls, dirt trees and shrubbery, and debris down to the waterproofing;
planter walls were cut down to the new configurations and existing waterproofing
was removed; post-tension cables were repaired
Application of new hot applied waterproofing and placement of protective layers of
concrete over Styrofoam to support the terrace restoration and reduce the weight
on the parking garage
Specialty pavers were custom cast for this project to closely resemble coral rock;
walkways and Terraces used natural shell stone to tie the Hotel to the beach;
architectural cable railing feature has almost a cruise ship look and certainly adds to
the ambiance by visually opening the space
Ramps were rebuilt to allow better egress and flow between the terrace, beach,
and pool; radius stairs were constructed of salt finish cast veneer following the
beach aesthetics; parapet walls were removed and replaced with cable railing.
Synlawn turf was placed to add color; anchors were installed so that tents could be
erected as needed for various events and two fire pits were built

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/9357/concrete-protection-restoration-inc/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.