Logo

Accord Construction, Inc.

Share

Plano, TX 75075

5.0

Company Info

  • Est. 1998
  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

We do what others can't do. Accord Construction, Inc. has been in business for over 20 years and has developed a reputation of doing what others in the industry can't do. If you need it done right the first time, on budget, and on schedule then we are the ones to call.

We specialize in working with Real Estate Owners, Property & Facility Management companies and General Contractors. By providing various services we can insure that you will receive the best solutions on your project.

Services:

  • Concrete Paving
  • Reinforced Concrete
  • Flat work/Sidewalks/curbs
  • Epoxy Injections
  • Concrete coatings & Treatments
  • Sealants
  • ADA Compliance

 

What We Do

Commercial Experience

Non-Residential Building Office Building
Animal Hospital / Kennel Apartments & Condominiums Assisted Living Athletic Field Auto Dealership / Service Bank Bridge Church / Synagogue City / Town Hall Club House / Community Center Court House Design Build Fitness Center Gas Station Golf Course Hotel / Motel Industrial Maintenance Laboratory Library Manufacturing Plant Marine Medical Office Misc Project Mixed Use Museum Park / Playground Parking Garage Parking Lots Post Office Radio / Television Station Restaurant Retail Store Road / Highway School / College / University Sewage / Water Treatment Plant Storage Facility / Warehouse Tennis Court Theater Tunnel Utilities

Regions & Counties Serviced

  • Dallas, Fort Worth

Texas 14

  • Collin
  • Dallas
  • Denton
  • Ellis
  • Henderson
  • Hood
  • Hunt
  • Johnson
  • Kaufman
  • Parker
  • Rockwall
  • Smith
  • Tarrant
  • Van Zandt

Our CSI Codes

03 01 20 - Maintenance of Concrete Reinforcing
03 01 30 - Maintenance of Cast-in-Place Concrete
03 01 30.51 - Cleaning of Cast-in-Place Concrete
03 01 30.61 - Resurfacing of Cast-in-Place Concrete
03 01 30.71 - Rehabilitation of Cast-in-Place Concrete
03 01 40.51 - Cleaning of Precast Concrete
03 01 40.61 - Resurfacing of Precast Concrete
03 01 40.71 - Rehabilitation of Precast Concrete
03 01 60 - Maintenance of Grouting
03 06 20 - Schedules for Concrete Reinforcing
03 06 20.13 - Concrete Beam Reinforcing Schedule
03 06 20.16 - Concrete Slab Reinforcing Schedule
03 06 30 - Schedules for Cast-in-Place Concrete
03 06 30.13 - Concrete Footing Schedule
03 06 30.16 - Concrete Column Schedule
03 06 30.19 - Concrete Slab Schedule
03 06 30.26 - Concrete Beam Schedule
03 11 13.13 - Concrete Slip Forming
03 30 53 - Miscellaneous Cast-in-Place Concrete
03 31 13 - Heavyweight Structural Concrete
03 31 23 - High-Performance Structural Concrete
03 35 23 - Exposed Aggregate Concrete Finishing
03 35 26 - Grooved Concrete Surface Finishing
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 21 16.13 - Methane Venting
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 33 - Shotcrete Soil Slope Stabilization
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 72 13 - Rock Reinforcement and Initial Support
32 01 13 - Flexible Paving Surface Treatment
32 01 13.61 - Slurry Seal (Latex Modified)
32 01 13.62 - Asphalt Surface Treatment
32 01 17 - Flexible Paving Repair
32 01 17.61 - Sealing Cracks in Asphalt Paving
32 01 17.62 - Stress-Absorbing Membrane Interlayer
32 01 19 - Rigid Paving Surface Treatment
32 01 19.61 - Sealing of Joints in Rigid Paving
32 01 19.62 - Patching of Rigid Paving
32 01 23 - Base Course Reconditioning
32 01 26 - Rigid Paving Rehabilitation
32 01 26.74 - Concrete Overlays
32 01 29 - Rigid Paving Repair
32 01 29.61 - Partial Depth Patching of Rigid Paving
32 01 29.62 - Concrete Paving Raising
32 01 29.63 - Subsealing and Stabilization
32 06 10 - Schedules for Bases, Ballasts, and Paving
32 06 10.13 - Pedestrian Walkway Schedule
32 11 13 - Subgrade Modifications
32 11 13.13 - Lime-Treated Subgrades
32 11 13.16 - Bituminous-Treated Subgrades
32 11 33 - Cement-Treated Base Courses
32 12 13.23 - Asphaltic Prime Coats
32 12 16.13 - Plant-Mix Asphalt Paving
32 12 16.16 - Road-Mix Asphalt Paving
32 12 16.19 - Cold-Mix Asphalt Paving
32 12 16.23 - Reinforced Asphalt Paving
32 12 16.26 - Fiber-Modified Asphalt Paving
32 12 16.29 - Polymer-Modified Asphalt Paving
32 12 16.33 - Granulated Rubber-Modified Asphalt Paving
32 12 33 - Flexible Paving Surface Treatments
32 12 36 - Seal Coats
32 12 36.16 - Coal Tar Seal Coats
32 12 36.19 - Coal Tar Seal Coats with Unvulcanized Rubber
32 12 36.23 - Fuel-Resistant Sealers
32 12 43 - Porous Flexible Paving
32 12 73 - Asphalt Paving Joint Sealants
32 13 13 - Concrete Paving
32 13 13.13 - Exposed Aggregate Concrete Paving
32 13 13.16 - Power-Compacted Concrete Paving
32 13 13.19 - Prestressed Concrete Paving
32 13 13.23 - Concrete Paving Surface Treatment
32 13 16 - Decorative Concrete Paving
32 13 16.13 - Patterned Concrete Paving
32 13 16.16 - Roller-Compacted Concrete Paving
32 13 16.19 - Imprinted Concrete Paving
32 13 16.23 - Stamped Concrete Paving
32 13 73 - Concrete Paving Joint Sealants
32 13 73.13 - Fuel-Resistant Concrete Paving Joint Sealants
32 13 73.16 - Field-Molded Concrete Paving Joint Sealants
32 13 73.19 - Compression Concrete Paving Joint Sealants
32 15 13 - Cinder Surfacing
32 16 13.13 - Cast-In-Place Concrete Curbs and Gutters
32 16 13.16 - Cast-In-Place Concrete Curbs
32 16 13.19 - Cast-In-Place Concrete Gutters
32 32 34 - Reinforced Soil Retaining Walls
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
34 01 33 - Operation and Maintenance of Airfields
34 05 33 - Common Work Results for Airports
34 06 33 - Schedules for Airfields
35 01 70 - Operation and Maintenance of Dams
35 05 70 - Common Work Results for Dams
35 06 70 - Schedules for Dams
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 41 16 - Levee Cutoff Trenches
35 42 35 - Slope Protection Bank Protection
35 43 35 - Slope Protection Scour Protection
35 49 13 - Floodwalls
35 49 13.13 - Concrete Floodwalls
35 70 00.00.01 - Dam Construction and Equipment
35 71 13 - Concrete Gravity Dams
35 71 16 - Masonry Gravity Dams
35 72 13 - Concrete Arch Dams
35 74 13 - Concrete Buttress Dams
40 23 36 - Sanitary Water Process Piping

Project Experience

  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Projects From $3,500 to $5,000,000

Gallery

Featured Image 1
Texas Instruments RFAB Chemical Dock
Featured Image 2
Services
Featured Image 3
Services
Featured Image 4
Services
Service Area and Locations Map for Accord Construction, Inc.

Preferred Brands

Ardex
Ardex
Sika Corporation
Sika Corporation
Share URL copied!
https://www.thebluebook.com/iProView/798968/accord-construction-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.