Logo

M.C.R. Development, Inc.

Orlando, FL 32862

Company Info

  • Est. 1979
  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

MCR Development Inc. is a family-owned business with over 42 yrs of experience servicing Central Florida.

We are known for our professionalism, integrity, honesty, and overall expertise in site development.

Our specialties are:

Underground Utilities:  (Storm Drainage,  Water Lines, Wet Tapping, Sewer Lines, Force Mains,

Lift Stations, directional drilling, and Pipe Laying)

 

Site Work:   (Land Clearing, Demolition, Excavating, Grading, installing base materials, and paving for the entire  site).

 

Contact us to see how our knowledge and expertise can save you time and money on your next project.

 

What We Do

Commercial Experience

Bank Civil & Site Development Misc Project Restaurant Retail Store Storage Facility / Warehouse
Animal Hospital / Kennel Apartments & Condominiums Arena / Stadium Assisted Living Auto Dealership / Service Church / Synagogue City / Town Hall Club House / Community Center Court House Design Build Fire / Police Station Fitness Center Gas Station Hospital / Nursing Home Hotel / Motel Jail / Prison Laboratory Library Manufacturing Plant Medical Office Mixed Use Museum Park / Playground Parking Garage Parking Lots Road / Highway School / College / University Sewage / Water Treatment Plant Tennis Court Terminal - Airport / Bus / Railroad Theater Utilities

Regions & Counties Serviced

  • Florida - North and Central

Florida 6

  • Brevard
  • Lake
  • Orange
  • Osceola
  • Seminole
  • Volusia

Our CSI Codes

01 35 16 - Alteration Project Procedures
01 55 16 - Haul Routes
01 74 16 - Site Maintenance
01 74 19 - Construction Waste Management and Disposal
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 93 16 - Recycling Programs
01 94 13 - Facility Decommissioning Procedures
02 32 19 - Exploratory Excavations
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 58 16 - Snow Avalanche Control
11 82 13 - Solid Waste Bins
22 05 76 - Facility Drainage Piping Cleanouts
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 06 20.16 - Backfill Material Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 21 16.13 - Methane Venting
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 23 - Fill
31 23 23.13 - Backfill
31 23 23.23 - Compaction
31 23 23.33 - Flowable Fill
31 23 23.43 - Geofoam
31 23 33 - Trenching and Backfilling
31 30 00.00.01 - Earthwork Methods
32 01 17.62 - Stress-Absorbing Membrane Interlayer
32 01 23 - Base Course Reconditioning
32 01 26 - Rigid Paving Rehabilitation
32 01 26.74 - Concrete Overlays
32 01 29 - Rigid Paving Repair
32 01 29.62 - Concrete Paving Raising
32 01 30 - Operation and Maintenance of Site Improvements
32 06 10 - Schedules for Bases, Ballasts, and Paving
32 06 10.13 - Pedestrian Walkway Schedule
32 06 30 - Schedules for Site Improvements
32 11 13 - Subgrade Modifications
32 11 13.13 - Lime-Treated Subgrades
32 11 13.16 - Bituminous-Treated Subgrades
32 12 13.23 - Asphaltic Prime Coats
32 12 16.13 - Plant-Mix Asphalt Paving
32 12 16.16 - Road-Mix Asphalt Paving
32 12 16.19 - Cold-Mix Asphalt Paving
32 12 16.23 - Reinforced Asphalt Paving
32 12 16.26 - Fiber-Modified Asphalt Paving
32 12 16.29 - Polymer-Modified Asphalt Paving
32 12 16.33 - Granulated Rubber-Modified Asphalt Paving
32 13 13 - Concrete Paving
32 13 13.13 - Exposed Aggregate Concrete Paving
32 13 13.16 - Power-Compacted Concrete Paving
32 13 13.19 - Prestressed Concrete Paving
32 13 16.13 - Patterned Concrete Paving
32 13 16.16 - Roller-Compacted Concrete Paving
32 13 16.19 - Imprinted Concrete Paving
32 13 16.23 - Stamped Concrete Paving
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 30.13 - Sewer and Manhole Testing
33 01 30.16 - TV Inspection of Sewer Pipelines
33 01 30.71 - Rehabilitation of Sewer Utilities
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 05 19 - Pressure Piping Tied Joint Restraint System
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 13 00.00.01 - Disinfecting of Water Utility Distribution
33 29 00.00.01 - Well Abandonment
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 39 23 - Sanitary Utility Sewerage Cleanouts
33 41 13 - Public Storm Utility Drainage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
34 01 33 - Operation and Maintenance of Airfields
34 05 33 - Common Work Results for Airports
34 06 33 - Schedules for Airfields
35 41 16 - Levee Cutoff Trenches
35 73 13 - Earth Embankment Dam
40 23 36 - Sanitary Water Process Piping
44 01 50 - Operation and Maintenance of Solid Waste Control
44 06 50 - Schedules for Solid Waste Control
44 51 26 - Solid Waste Containers
44 51 29 - Solid Waste Transfer Trailers

Project Experience

  • Non-Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • New Projects
  • Alterations/Renovations
  • Projects From $300 to $2,000,000

Gallery

Featured Image 1
7-11 Photo 1
Featured Image 2
Wendy's Restaurant Photo 1
Featured Image 3
Popeyes - Clermont
Featured Image 4
Popeyes - McCoy Rd.
Share URL copied!
https://www.thebluebook.com/iProView/796578/m-c-r-development-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.