Logo

William A. Hazel, Inc.

Share

Chantilly, VA 20151

Home Contact Us

Company Info

  • Est. 1964
  • Size 100-249 Employees
  • Annual Vol > $50 million

People Also View These
Loading...

Our Story

It’s said necessity is the mother of invention and is precisely why William A. Hazel, Inc. invented the concept of “total site development”. It all stemmed from the notion that if you want something done right, do it yourself. Over the years, the company has created a legacy for doing things right because they can control all aspects of the project. Their long list of repeat clients are a testament to the benefits of the total site development concept.

 

What We Do

Regions & Counties Serviced

  • Washington D.C.
  • Virginia

Virginia 16

  • Alexandria (City Of)
  • Culpeper
  • Fairfax
  • Fairfax (City Of)
  • Falls Church (City Of)
  • Fauquier
  • Fredericksburg (City Of)
  • Greene
  • King George
  • Loudoun
  • Manassas (City Of)
  • Manassas Park (City Of)
  • Prince William
  • Spotsylvania
  • Stafford
  • Winchester (City Of)

Our CSI Codes

01 53 26 - Temporary Runarounds
01 55 19 - Temporary Parking Areas
01 55 23 - Temporary Roads
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 32 19 - Exploratory Excavations
03 37 23 - Roller-Compacted Concrete
22 13 13 - Facility Sanitary Sewers
22 14 13 - Facility Storm Drainage Piping
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 16.13 - Roadway Subgrade Reshaping
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 30 00.00.01 - Earthwork Methods
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 10 - Operation and Maintenance of Water Utilities
33 01 30 - Operation and Maintenance of Sewer Utilities
33 01 30.51 - Maintenance of Sewer Utilities
33 05 13.13 - Manhole Grade Adjustment
33 06 10 - Schedules for Water Utilities
33 06 30 - Schedules for Sanitary Sewerage Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 10 00.00.01 - Water Utilities
33 11 13 - Public Water Utility Distribution Piping
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 30 00.00.01 - Sanitary Sewerage Utilities
33 31 13 - Public Sanitary Utility Sewerage Piping
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
34 01 13 - Operation and Maintenance of Roadways
34 01 43 - Operation and Maintenance of Bridges
34 05 13 - Common Work Results for Roadways
34 05 43 - Common Work Results for Bridges
34 06 13 - Schedules for Roadways
34 06 43 - Schedules for Bridges
35 73 13 - Earth Embankment Dam
40 23 36 - Sanitary Water Process Piping

Project Experience

  • Non-Union
  • Public
  • Private
  • New Projects
  • Projects Up to $50,000,000

Gallery

Featured Image 1
Sentara
Featured Image 2
Inova Fair Oaks Hospital
Featured Image 3
Cobb Theatres
Featured Image 4
King Pinz
Service Area and Locations Map for William A. Hazel, Inc.

Associations & Memberships

VUHCC (Virginia Utility & Heavy Contractors Council)
VUHCC (Virginia Utility & Heavy Contractors Council)
HCCA (Heavy Construction Contractors Assn.)
HCCA (Heavy Construction Contractors Assn.)
NUCA (National Utility Contractors Assn.)
NUCA (National Utility Contractors Assn.)
NVBIA (Northern Virginia Building Industry Assn.)
NVBIA (Northern Virginia Building Industry Assn.)
VTCA (Virginia Transportation Construction Alliance)
VTCA (Virginia Transportation Construction Alliance)
NVTA (Northern Virginia Transportation Alliance)
NVTA (Northern Virginia Transportation Alliance)
Associated Builders and Contractors
Associated Builders and Contractors
Share URL copied!
https://www.thebluebook.com/iProView/6159/william-a-hazel-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.