Featured Project Return to Projects List

Holy Family Catholic Church

Project Information

Project Location:
Orlando, FL
Approx Contract:
$833,453
Status:
Completed
Structure Type:
Church / Synagogue

References

Owner:
The Catholic Diocese of Orlando
Architect:
Hunton Brady Architects
General Contractor:
Brasfield & Gorrie
Client:
Eric Lindquist
(407) 562-4500
Brasfield & Gorrie

Scope Of Work

Brassfield and Gorrie contracted B & B Interior Systems to perform the metal framing and drywall for the interior of the new Holy Family Catholic Church.  The interior finish would be a level 5 drywall finish.  The project contract amount was $833,000.00.  The project was slated to take six months.

 

 

 

 

Brassfield and Gorrie choose B & B Interior Systems, Inc, because the interior layout was not your typical church layout.  By typical layout I am referring to a long or rectangular hallway.  The new Holy Family Catholic Church would be a show piece of the Catholic Faith in the local area.  To accomplish the church’s desires the architect filled the church’s interior with very high end finishes, custom curved radius intersecting other radius curves.  The walls were high and had to match up perfectly with the exposed wooden roof and trusses which were being delivered pre manufactured to the job site.  The Church also featured several stained glass windows that are not square in shape.  These pointed custom shaped windows had to be fitted and the drywall had to be angled to meet them.  Some of these windows were also very high up and required special scaffolding to reach them.  In some of the alcoves the ceiling has fitted symmetrical ripples that originate from a single point and spread outward in a 360 degree circle.

 

All of these very intricate designs called for a high level of craftsmen skill not only in the drywall hanging and finishing but also in the metal framing.  The metal framers spent long hours measuring, cutting and bending the metal framing material to the exact specifications called for by the architect.

 

Many times in the construction process the metal framing, hanging and finishing was done prior to the woodwork being completed.  This left no room for error since the wood was being manufactured off site.

 

Share URL copied!
https://www.thebluebook.com/iProView/466/b-b-interior-systems-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.