Logo

SEECO Consultants Inc.

Share

Tinley Park, IL 60477

Company Info

  • Est. 1970
  • Annual Vol Undisclosed

Featured Project Return to Projects List

143rd St. Bridge over DuPage River

Project Information

Project Location:
Plainfield, IL
Status:
Completed
Structure Type:
Road / Highway

References

Client:
Village of Plainfield

Scope Of Work

New roadway alignment, retaining walls and new 7 span 840 foot bridge over the DuPage River.

Geotechnical Exploration, Laboratory Testing and Engineering and Analysis for new roadway alignment.  Included new roadway profile with embankment and existing intersection improvements, analysis and design data for MSE retaining walls for embankment, and global slope stability and foundation recommendations for a new 7 span, 855 foot long bridge over the DuPage River.  Structure geotech report (SGR) criteria was implemented in the prepared report. An SGR was prepared for both the bridge and the retaining walls. An RGR report was prepared for the new pavement alignment.

Share URL copied!
https://www.thebluebook.com/iProView/366429/seeco-consultants-inc/engineers/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.