Company Info

  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

At Apple Valley Contracting, our mission is to deliver precision rock drilling solutions that power progress on the most demanding construction projects. With cutting-edge equipment and deep industry expertise, we specialize in overcoming the toughest geological challenges to ensure safe, efficient, and accurate results—whether for solar installations, infrastructure development, or any large-scale application that requires uncompromising drilling performance.

  • rock drilling applications
  • Pre-drilling
  • Pile driving
  • Ground screw installation
  • Blasting
  • Augering
  • Tiebacks
  • Micropiles
  • Drilled shafts and caissons
  • Fencing
  • Solar Installation

What We Do

Commercial Experience

Airport Runway Animal Hospital / Kennel Apartments & Condominiums Arena / Stadium Assisted Living Athletic Field Auto Dealership / Service Bank Casinos Church / Synagogue Civil & Site Development Dams & Levies Education (K-12) Gas Station Grocery Stores Hotel / Motel Jail / Prison Lighting Retrofits Medical Office Misc Project Non-Building Construction Parking Garage Power Generation & Distribution Renewable Energy Retail Store Secure and Shielded Facilities Storage Facility / Warehouse Terminal - Airport / Bus / Railroad Tract Housing

Regions & Counties Serviced

  • Coastal Carolina
  • Washington D.C.
  • Pennsylvania-Eastern
  • Virginia
  • West Virginia

Maryland All

North Carolina All

Pennsylvania All

South Carolina All

Virginia All

West Virginia All

Our CSI Codes

01 14 13 - Access to Site
01 56 26 - Temporary Fencing
01 57 13 - Temporary Erosion and Sediment Control
01 71 33 - Protection of Adjacent Construction
01 73 23 - Bracing and Anchoring
01 76 00.00.01 - Protecting Installed Construction
02 05 19 - Geosynthetics for Existing Conditions
02 05 19.13 - Geotextiles for Existing Conditions
02 05 19.16 - Geomembranes for Existing Conditions
02 05 19.19 - Geogrids for Existing Conditions
02 58 13 - Snow Fencing
13 01 50 - Operation and Maintenance of Special Instrumentation
13 06 50 - Schedules for Special Instrumentation
13 08 50 - Commissioning of Special Instrumentation
13 53 13 - Solar Instrumentation
13 53 23 - Wind Instrumentation
23 56 13 - Heating Solar Collectors
23 56 13.13 - Heating Solar Flat-Plate Collectors
23 56 13.16 - Heating Solar Concentrating Collectors
23 56 13.19 - Heating Solar Vacuum-Tube Collectors
23 56 16 - Packaged Solar Heating Equipment
26 31 00.00.01 - Photovoltaic Collectors
26 32 23 - Wind Energy Equipment
31 05 19 - Geosynthetics for Earthwork
31 05 19.13 - Geotextiles for Earthwork
31 05 19.16 - Geomembranes for Earthwork
31 05 19.19 - Geogrids for Earthwork
31 25 13 - Erosion Controls
31 25 23 - Rock Barriers
31 25 53 - Sedimentation Controls
31 25 63 - Rock Basins
31 31 19 - Vegetation Control
31 31 19.13 - Chemical Vegetation Control
31 32 19.19 - Geogrid Layer Separation
31 32 19.23 - Geotextile Layer Separation
31 34 19 - Geosynthetic Soil Reinforcement
31 34 19.13 - Geogrid Soil Reinforcement
31 34 19.16 - Geotextile Soil Reinforcement
31 34 23 - Fiber Soil Reinforcement
31 34 23.13 - Geosynthetic Fiber Soil Reinforcement
31 35 23.19 - Concrete Unit Masonry Slope Paving
31 37 13 - Machined Riprap
31 37 16 - Non-Machined Riprap
31 37 16.16 - Concrete Unit Masonry Riprap
31 37 16.19 - Sacked Sand-Cement Riprap
31 63 33 - Drilled Micropiles
32 31 13 - Chain Link Fences and Gates
32 31 13.23 - Recreational Court Fences and Gates
32 31 13.26 - Tennis Court Fences and Gates
32 31 13.29 - Tennis Court Wind Breaker
32 31 13.33 - Chain Link Backstops
32 31 13.53 - High-Security Chain Link Fences and Gates
32 31 16 - Welded Wire Fences and Gates
32 31 19 - Decorative Metal Fences and Gates
32 31 23 - Plastic Fences and Gates
32 31 26 - Wire Fences and Gates
32 31 29 - Wood Fences and Gates
32 91 13.13 - Hydro-Punching
32 91 13.16 - Mulching
32 91 13.23 - Structural Soil Mixing
32 92 13 - Hydro-Mulching
32 92 19 - Seeding
32 92 19.13 - Mechanical Seeding
32 92 19.16 - Hydraulic Seeding
32 92 23 - Sodding
32 92 26 - Sprigging
32 92 26.13 - Stolonizing
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
34 43 23.16 - Airfield Wind Cones
34 82 19 - Bridge Pier Protection
35 31 29.40 - Stone Groins
35 42 29 - Grout-Bag Bank Protection
35 42 34 - Soil Reinforcement Bank Protection
35 43 29 - Grout-Bag Scour Protection
35 43 34 - Soil Reinforcement Scour Protection
41 33 23 - Drilling Equipment
41 66 13 - Mobile Boring and Drilling Rigs
42 12 23 - Solar Process Heaters
45 11 01 - Operation and Maintenance of Oil and Gas Extraction Equipment
45 11 06 - Schedules for Oil and Gas Extraction Equipment
48 12 29 - Nuclear Fuel Electrical Power Plant Turbines
48 14 13 - Solar Energy Collectors
48 14 13.13 - Amorphous Solar Energy Collectors
48 14 13.16 - Plate Cell Solar Energy Collectors
48 14 13.19 - Vacuum Tube Solar Energy Collectors
48 15 13 - Windmills
48 15 16 - Wind Energy Electrical Power Generators
48 18 16 - Hydrogen Control Equipment
48 19 19 - Electrical Power Generation Solar Tracking Equipment

Project Experience

  • Service Work/Repairs

Gallery

Service Area and Locations Map for Apple Valley Contracting
Share URL copied!
https://www.thebluebook.com/iProView/1901346/apple-valley-contracting/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.