Logo

Preload

Woburn, MA 01801

Company Info

  • Est. 1930
  • Size 100-249 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Monroe County Water Authority

Project Information

Project Location:
Chili, NY
Status:
Completed
Structure Type:
Sewage / Water Treatment Plant

References

Owner:
Monroe County Water Authority

Scope Of Work

Construction Date 1994

Application Water Storage

Capacity 3.0MG (110’ ID x 42’ SWD)

Owner Monroe County Water Authority

Consulting Engineer Larsen Engineers, Rochester, NY

The Town of Chili, a suburb of Rochester, is in Monroe County, New York. To accommodate the community’s steadily growing population and demand for water, the Monroe County Water Authority began working with Larsen Engineers, Rochester, NY, in 1992. After researching available options and their costs and benefits, the project team selected Preload to design and build an AWWA D110 Type III wire-wound prestressed concrete water storage tank for its proven cold-climate performance and economy of ownership.

Built in 1994, this 3.0 MG Preload tank has an inside diameter of 110’ and a side water depth of 42’. With Preload’s superior design and construction, this tank will continue to withstand the extreme New York winters for many decades to come.

Share URL copied!
https://www.thebluebook.com/iProView/1560941/preload/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.