Logo

Target Locked

Austin, TX 78727

Company Info

  • Est. 2017
  • Size 5-9 Employees
  • Annual Vol $500,000 - $1 million

People Also View These
Loading...

Our Story

We are a central Texas, family owned business, with over 10 years of experience.  Our services include surveying, site development, excavating, underground utilities, concrete, hard scapes, foundations and demolition. We pride ourselves on accuracy and doing the job right the first time. 

 

What We Do

Commercial Experience

Apartments & Condominiums Club House / Community Center House
Animal Hospital / Kennel Assisted Living Athletic Field Auto Dealership / Service Bank Church / Synagogue Civil & Site Development Fitness Center Gas Station Golf Course Grocery Stores Hospital / Nursing Home Hotel / Motel Industrial Maintenance Jail / Prison Manufacturing Plant Medical Office Misc Project Mixed Use Non-Residential Building Office Building Park / Playground Parking Garage Parking Lots Residential Building Restaurant Road / Highway Single Family Residential Swimming Pool Tennis Court Theater Tract Housing

Regions & Counties Serviced

  • San Antonio and Austin

Texas All

Our CSI Codes

01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 94 13 - Facility Decommissioning Procedures
02 32 19 - Exploratory Excavations
02 40 00.00.01 - Demolition and Structure Moving
02 41 13 - Selective Site Demolition
02 41 13.23 - Utility Line Removal
02 41 16 - Structure Demolition
02 41 16.13 - Building Demolition
02 41 16.23 - Tower Demolition
02 41 16.33 - Bridge Demolition
02 41 16.43 - Dam Demolition
02 41 19 - Selective Structure Demolition
02 41 19.13 - Selective Building Demolition
02 41 91 - Selective Historic Demolition
02 42 91 - Removal and Salvage of Historic Construction Materials
02 58 16 - Snow Avalanche Control
03 11 13.13 - Concrete Slip Forming
03 35 23 - Exposed Aggregate Concrete Finishing
03 35 26 - Grooved Concrete Surface Finishing
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 21 16.13 - Methane Venting
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 30 00.00.01 - Earthwork Methods
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 16 13.13 - Cast-In-Place Concrete Curbs and Gutters
32 16 13.16 - Cast-In-Place Concrete Curbs
32 16 13.19 - Cast-In-Place Concrete Gutters
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
35 41 16 - Levee Cutoff Trenches
35 73 13 - Earth Embankment Dam
40 23 36 - Sanitary Water Process Piping

Project Experience

  • Non-Union
  • Private
  • New Projects
  • Alterations/Renovations
  • Service Work/Repairs

Gallery

Featured Image 2
Skybridge
Featured Image 3
Services
Featured Image 4
Services
Share URL copied!
https://www.thebluebook.com/iProView/1521546/target-locked/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.