Logo

Pileworks

Magnolia, TX 77355

Company Info

  • Est. 2014
  • Size 20-49 Employees

Featured Project Return to Projects List

Radar Site Installation

Project Information

Project Location:
Toolik Lake, AL
Status:
Completed
Structure Type:
Misc Project

Scope Of Work

Project:Toolik Lake Radar Site Foundation
 
Installation Criteria:
400 ea. Drilled and Cased Micropile
 
Project Lead:
Tom DePeter
 
Equipment:Cat 320 and HD50
 
Installation Depths:
10′ to 25′
Jobsite Restrictions:
Remote work area, Environmental concerns with large footprint equipment.
 
Geotechnical Concerns:
Dense Continuous Rock, Frozen Clays and Tundra.
 
APE supplied:
Built Custom Drill Tooling used to Drill through solid rock and Frozen soils
 
Time to Install single unit:

10 Minutes to drill with Down-the-hole Hammer, each location
 
APE job influence:
Designed Drilling system to run air tools that can be run on smaller excavators
  
 
Description:With -40 below and miles from the nearest town not being a big enough challenge already, Onyx undertook this project on with a stride that carried them all the way to project completion 3 weeks ahead of schedule.
 

A month prior to the Project start date APE set out the build a smaller, lighter platform drilling configuration that would allow the contractor to utilize a wide array of drill tooling.

 With no ice roads to work from,this configuration insured that minimal environmental damages would occur while running on top of the sensitive tundra.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1456223/pileworks/manufacturers/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.